HYDROGEOLOGICAL ASSESSMENTSTRANGE STREET WATER SUPPLY CLASS EA UPDATEREGIONAL MUNICIPALITY OF WATERLOOReferencesMarch 19, 2012Lotowater Technical Services Inc. (Lotowater). 2011a. Well K10A 2010 Well Rehabilitation.Prepared for the <strong>Region</strong>al Municipality <strong>of</strong> <strong>Waterloo</strong>. February 18, 2011.Lotowater Technical Services Inc. (Lotowater). 2011b. K15 Pump Removal and WellAssessment. Letter Prepared for Stantec Consulting Ltd. March 2, 2011.Neuman, S.P. and P.A. Witherspoon, 1969. Theory <strong>of</strong> flow in a confined two aquifer system.Water Resources Research. Vol. 5, No. 4, pp. 803-816.Ontario Geological Survey (OGS). 2003. Surficial Geology Mapping.Ontario Geological Survey (OGS), 1991. Bedrock Geology <strong>of</strong> Ontario, Southern Sheet; OntarioGeological Survey Map 2544, scale 1:1,000,000.Paloschi, G.V.R., 1993. Subsurface Stratigraphy <strong>of</strong> the <strong>Waterloo</strong> Moraine. M.Sc. Project,University <strong>of</strong> <strong>Waterloo</strong>, <strong>Waterloo</strong>, Ontario.<strong>Region</strong>al Municipality <strong>of</strong> <strong>Waterloo</strong> (<strong>Region</strong>), 2008. Standard Operating Procedures – WaterResources Protection, Core Storage. April 27, 2008, revised September 23, 2008.Stantec Consulting Ltd. (Stantec), 2000. Kitchener West Side Water Project: BackgroundHydrogeology Assessment; Final Report. Prepared for the <strong>Region</strong>al Municipality <strong>of</strong><strong>Waterloo</strong>. May 2000.Stantec Consulting Ltd. (Stantec). 2005. Production Well K19 Well Construction and Testing.Prepared for the <strong>Region</strong>al Municipality <strong>of</strong> <strong>Waterloo</strong>. July 2005.Stantec Consulting Ltd. (Stantec), 2009. Tier 3 Water Budget and Water Quantity RiskAssessment, Strange Street Well Field Characterization Study. Prepared for the<strong>Region</strong>al Municipality <strong>of</strong> <strong>Waterloo</strong>. June 2009.Stantec Consulting Ltd. (Stantec), 2010a. Strange Street Well Field – Well Summary andAction Items. Memorandum to the <strong>Region</strong>al Municipality <strong>of</strong> <strong>Waterloo</strong>, May 6, 2010.Stantec Consulting Ltd. (Stantec), 2010b. Standard Operating Procedure for DischargingDrilling Fluids to Municipal Sewers. Memorandum to the <strong>Region</strong>al Municipality <strong>of</strong><strong>Waterloo</strong>, December 23, 2010.Stantec Consulting Ltd. (Stantec), 2011. Strange Street Well Field Pumping Test <strong>of</strong> GzowskiPark Test Well – Evaluation <strong>of</strong> the Potential Adverse Effects to Human and EcologicalReceptors from the Release <strong>of</strong> Water Used in a Pumping Test for K-SS-TW1-11 – FinalReport. Prepared for the <strong>Region</strong>al Municipality <strong>of</strong> <strong>Waterloo</strong>. March 29, 2011.7.2 hls v:\01609\active\161110897_strange_st\planning\report\final hydrogeo assessment\final\fnl_rpt_120319.docx
HYDROGEOLOGICAL ASSESSMENTSTRANGE STREET WATER SUPPLY CLASS EA UPDATEREGIONAL MUNICIPALITY OF WATERLOOReferencesMarch 19, 2012Terraqua Investigations Ltd. 1995. The Study <strong>of</strong> the Hydrogeology <strong>of</strong> the <strong>Waterloo</strong> Moraine:Final Report. Prepared for the <strong>Region</strong>al Municipality <strong>of</strong> <strong>Waterloo</strong>. December, 1995.Theis, C.V., 1935. The relation between the lowering <strong>of</strong> the piezometric surface and the rateand duration <strong>of</strong> discharge <strong>of</strong> a well using groundwater storage. Am. Geophys. UnionTrans., Vol. 16 pp 519-524.hls v:\01609\active\161110897_strange_st\planning\report\final hydrogeo assessment\final\fnl_rpt_120319.docx 7.3
- Page 2 and 3:
August 26, 2011Sam ZiemannPage 2 of
- Page 4 and 5:
August 26, 2011Sam ZiemannPage 4 of
- Page 6 and 7:
August 26, 2011Sam ZiemannPage 6 of
- Page 8 and 9:
August 26, 2011Sam ZiemannPage 8 of
- Page 10 and 11:
August 26, 2011Sam ZiemannPage 10 o
- Page 12 and 13:
August 26, 2011Sam ZiemannPage 12 o
- Page 14 and 15:
Pressure (kPa)K18/K19 Well House to
- Page 16 and 17:
Figure 4a - Existing ConditionsPump
- Page 18 and 19: Figure 6a - Existing System w/Combi
- Page 20 and 21: Figure 8a - Existing ConditionsWell
- Page 22 and 23: Figure 10a - Future System w/Combin
- Page 24 and 25: MD-80 CATALYTIC MEDIAIRON, MANGANES
- Page 26 and 27: NR - Pressure FiltersHorizontal and
- Page 28 and 29: Napier-Reid Ltd.Pressure FiltersSal
- Page 30 and 31: APPENDIX EHydrogeological Assessmen
- Page 32 and 33: HYDROGEOLOGICAL ASSESSMENTSTRANGE S
- Page 34 and 35: HYDROGEOLOGICAL ASSESSMENTSTRANGE S
- Page 36 and 37: HYDROGEOLOGICAL ASSESSMENTSTRANGE S
- Page 38 and 39: HYDROGEOLOGICAL ASSESSMENTSTRANGE S
- Page 40 and 41: HYDROGEOLOGICAL ASSESSMENTSTRANGE S
- Page 42 and 43: HYDROGEOLOGICAL ASSESSMENTSTRANGE S
- Page 44 and 45: HYDROGEOLOGICAL ASSESSMENTSTRANGE S
- Page 46 and 47: HYDROGEOLOGICAL ASSESSMENTSTRANGE S
- Page 48 and 49: HYDROGEOLOGICAL ASSESSMENTSTRANGE S
- Page 50 and 51: HYDROGEOLOGICAL ASSESSMENTSTRANGE S
- Page 52 and 53: HYDROGEOLOGICAL ASSESSMENTSTRANGE S
- Page 54 and 55: HYDROGEOLOGICAL ASSESSMENTSTRANGE S
- Page 56 and 57: HYDROGEOLOGICAL ASSESSMENTSTRANGE S
- Page 58 and 59: HYDROGEOLOGICAL ASSESSMENTSTRANGE S
- Page 60 and 61: HYDROGEOLOGICAL ASSESSMENTSTRANGE S
- Page 62 and 63: HYDROGEOLOGICAL ASSESSMENTSTRANGE S
- Page 64 and 65: HYDROGEOLOGICAL ASSESSMENTSTRANGE S
- Page 66 and 67: HYDROGEOLOGICAL ASSESSMENTSTRANGE S
- Page 70: HYDROGEOLOGICAL ASSESSMENTSTRANGE S
- Page 78 and 79: 25Pumping Rate20Pumping Rate (L/s)1
- Page 80 and 81: HYDROGEOLOGICAL ASSESSMENTSTRANGE S
- Page 82 and 83: TABLE 2SUMMARY OF GROUNDWATER ANALY
- Page 84 and 85: CALCULATION OF SPECIFIC CAPACITY FR
- Page 111 and 112: March 2, 2011Reference: 006-189Stan
- Page 113 and 114: TABLE 1REGIONAL MUNICIPALITY OF WAT
- Page 132 and 133:
HYDROGEOLOGICAL ASSESSMENTSTRANGE S
- Page 134 and 135:
July 23, 2010Lisa Lachuta, P.Eng.Pa
- Page 136 and 137:
July 23, 2010Lisa Lachuta, P.Eng.Pa
- Page 138 and 139:
July 23, 2010Lisa Lachuta, P.Eng.Pa
- Page 140:
TECHNICAL MEMORANDUM A1 -STRANGE ST
- Page 143 and 144:
TECHNICAL MEMORANDUM A1 -STRANGE ST
- Page 145:
TABLE 1SUMMARY OF GROUNDWATER ANALY