13.07.2015 Views

Sam Ziemann From - Region of Waterloo

Sam Ziemann From - Region of Waterloo

Sam Ziemann From - Region of Waterloo

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

HYDROGEOLOGICAL ASSESSMENTSTRANGE STREET WATER SUPPLY CLASS EA UPDATEREGIONAL MUNICIPALITY OF WATERLOOReferencesMarch 19, 2012Lotowater Technical Services Inc. (Lotowater). 2011a. Well K10A 2010 Well Rehabilitation.Prepared for the <strong>Region</strong>al Municipality <strong>of</strong> <strong>Waterloo</strong>. February 18, 2011.Lotowater Technical Services Inc. (Lotowater). 2011b. K15 Pump Removal and WellAssessment. Letter Prepared for Stantec Consulting Ltd. March 2, 2011.Neuman, S.P. and P.A. Witherspoon, 1969. Theory <strong>of</strong> flow in a confined two aquifer system.Water Resources Research. Vol. 5, No. 4, pp. 803-816.Ontario Geological Survey (OGS). 2003. Surficial Geology Mapping.Ontario Geological Survey (OGS), 1991. Bedrock Geology <strong>of</strong> Ontario, Southern Sheet; OntarioGeological Survey Map 2544, scale 1:1,000,000.Paloschi, G.V.R., 1993. Subsurface Stratigraphy <strong>of</strong> the <strong>Waterloo</strong> Moraine. M.Sc. Project,University <strong>of</strong> <strong>Waterloo</strong>, <strong>Waterloo</strong>, Ontario.<strong>Region</strong>al Municipality <strong>of</strong> <strong>Waterloo</strong> (<strong>Region</strong>), 2008. Standard Operating Procedures – WaterResources Protection, Core Storage. April 27, 2008, revised September 23, 2008.Stantec Consulting Ltd. (Stantec), 2000. Kitchener West Side Water Project: BackgroundHydrogeology Assessment; Final Report. Prepared for the <strong>Region</strong>al Municipality <strong>of</strong><strong>Waterloo</strong>. May 2000.Stantec Consulting Ltd. (Stantec). 2005. Production Well K19 Well Construction and Testing.Prepared for the <strong>Region</strong>al Municipality <strong>of</strong> <strong>Waterloo</strong>. July 2005.Stantec Consulting Ltd. (Stantec), 2009. Tier 3 Water Budget and Water Quantity RiskAssessment, Strange Street Well Field Characterization Study. Prepared for the<strong>Region</strong>al Municipality <strong>of</strong> <strong>Waterloo</strong>. June 2009.Stantec Consulting Ltd. (Stantec), 2010a. Strange Street Well Field – Well Summary andAction Items. Memorandum to the <strong>Region</strong>al Municipality <strong>of</strong> <strong>Waterloo</strong>, May 6, 2010.Stantec Consulting Ltd. (Stantec), 2010b. Standard Operating Procedure for DischargingDrilling Fluids to Municipal Sewers. Memorandum to the <strong>Region</strong>al Municipality <strong>of</strong><strong>Waterloo</strong>, December 23, 2010.Stantec Consulting Ltd. (Stantec), 2011. Strange Street Well Field Pumping Test <strong>of</strong> GzowskiPark Test Well – Evaluation <strong>of</strong> the Potential Adverse Effects to Human and EcologicalReceptors from the Release <strong>of</strong> Water Used in a Pumping Test for K-SS-TW1-11 – FinalReport. Prepared for the <strong>Region</strong>al Municipality <strong>of</strong> <strong>Waterloo</strong>. March 29, 2011.7.2 hls v:\01609\active\161110897_strange_st\planning\report\final hydrogeo assessment\final\fnl_rpt_120319.docx

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!