- Page 1 and 2: MINISTERUL MEDIULUI SI PADURILORINS
- Page 3 and 4: WORK TEAM‣ DANUBE DELTA NATIONAL
- Page 5 and 6: Phase 1 - Preparation of the Danube
- Page 7 and 8: The river restoration projects prec
- Page 9 and 10: the Upper Danube and > 30 km in the
- Page 11 and 12: navigation. Hence, the creation and
- Page 13 and 14: Non-native and Invasive speciesFor
- Page 15 and 16: members of the public, and cooperat
- Page 17 and 18: activities. This principle is actua
- Page 19 and 20: 2007. The exercise should be finali
- Page 21 and 22: from 30 ha to 600.000 ha, have been
- Page 23 and 24: Challenges and recommendations for
- Page 25 and 26: Bureaucracy, corruption, and politi
- Page 27 and 28: MATERIALS AND METHODS WITHIN PHASE
- Page 29 and 30: addresses the longitudinal linkages
- Page 31 and 32: create an adequate territorial plan
- Page 33 and 34: Activity 1.2. A public debate about
- Page 35 and 36: Aims of the project:• Bring back
- Page 37 and 38: • strengthening capacity to prote
- Page 39 and 40: Elaborate detailed technical engine
- Page 41 and 42: Project name:3. Extension of the ex
- Page 43: Whole the area of Belene Island com
- Page 47 and 48: sections about 35 ha of new gravel
- Page 49 and 50: fish, the hard construction caused
- Page 51 and 52: Results of the project:At the end o
- Page 53 and 54: The higher reaches of the slopes wh
- Page 55 and 56: The new channel, which rejoins the
- Page 57 and 58: Project name:10. National Park Dona
- Page 59 and 60: Project name:12. LIFE05NAT/SK/00011
- Page 61 and 62: presentation of the project in medi
- Page 63 and 64: Project name:13. Krapje Djol (Croat
- Page 65 and 66: Project name:15. Ecological Restora
- Page 67 and 68: • the periodical alternation of f
- Page 69 and 70: Another important finding was that
- Page 71 and 72: een destroyed. Since the political
- Page 73 and 74: It is an intensive process that org
- Page 75 and 76: Such tools are:• "time line chart
- Page 77 and 78: 1.1.2. Classification of Danube Riv
- Page 79 and 80: CONCLUSIONSAlong the Danube River,
- Page 81 and 82: BIBLIOGRAPHY1. Binder W., (2008), R
- Page 83 and 84: MINISTERUL MEDIULUI SI PADURILORINS
- Page 85 and 86: WORK TEAM DANUBE DELTA NATIONAL INS
- Page 87 and 88: Phase 2 - Comprehensive Danube Rive
- Page 89 and 90: This first activity consists in the
- Page 91 and 92: The river grows and the gradient le
- Page 93 and 94: The importance of the connectivityC
- Page 95 and 96:
Does the design invite invasive spe
- Page 97 and 98:
3. Self sustainingThe ecosystem is
- Page 99 and 100:
Table 2- List of revitalisation pro
- Page 102 and 103:
2.3.2. Background information (Babi
- Page 104 and 105:
Catchment3 area size:4 Geology1 sma
- Page 106 and 107:
456to improve longitudinalconnectiv
- Page 108 and 109:
The second project that was success
- Page 110 and 111:
2.3.5. Cernovca background Informat
- Page 112 and 113:
2.3.7. Ecological reconstruction im
- Page 114 and 115:
For the areas, the reestablishment
- Page 116 and 117:
Once a general agreement on reasona
- Page 118 and 119:
BIBLIOGRAPHY1. Benke, A. C. (2001),
- Page 120 and 121:
MINISTERUL MEDIULUI SI PADURILORINS
- Page 122 and 123:
WORK TEAM‣ DANUBE DELTA NATIONAL
- Page 124 and 125:
III.2.2. Ecoregions and surface wat
- Page 126 and 127:
The geometric features of the river
- Page 128 and 129:
Revitalization as defined in Los An
- Page 130 and 131:
Danube Basin region is a functional
- Page 132 and 133:
egimes. However, the Iron Curtain a
- Page 134 and 135:
The main issuesEnvironment in the D
- Page 136 and 137:
states that joined at different tim
- Page 138 and 139:
The role and contribution of Romani
- Page 140 and 141:
Types of eligible expenditure- Gene
- Page 142 and 143:
I.4 Conceptual Framework and its re
- Page 144 and 145:
Is the river able to connect with i
- Page 146 and 147:
certain locations on the same strea
- Page 148 and 149:
limited pool of potential colonizer
- Page 150 and 151:
Creating oportunities and valuesIn
- Page 152 and 153:
Figure 4 - General model of ecosyst
- Page 154 and 155:
The coherent understanding and the
- Page 156 and 157:
Starting form the Corine Land Cover
- Page 158 and 159:
investments that are introduced to
- Page 160 and 161:
Figure 8 - Adding another category
- Page 162 and 163:
Reserves (m3)Indicators of availabi
- Page 164 and 165:
EconomicEconomic performanceEconomi
- Page 166 and 167:
and compared to other MCA methods (
- Page 168 and 169:
ii. Tourism attractiveness - of the
- Page 170 and 171:
• Incorporate risk analysis into
- Page 172 and 173:
the River in Cat’s Bend, Romania,
- Page 174 and 175:
Also, all the difficulties and succ
- Page 176 and 177:
wetlands that are natural habitats
- Page 178 and 179:
Thus, in the given circumstances, t
- Page 180 and 181:
The desire to understand the crisis
- Page 182 and 183:
Environment Agency - CLC200, on lan
- Page 184 and 185:
‣ Monitoring results of revitaliz
- Page 186 and 187:
‣ Morava River (Slovakia and Aust
- Page 188 and 189:
(i) The surface water bodies within
- Page 190 and 191:
System BAlternative characterisatio
- Page 192 and 193:
System BAlternativecharacterisation
- Page 194 and 195:
water type. In such circumstances M
- Page 196 and 197:
arriers limit the natural recovery
- Page 198 and 199:
III.4.2 Metoda SketchMatch (SM)An i
- Page 200 and 201:
c) The Focus groups structures (hom
- Page 202 and 203:
4 Sidearm restoration project Schö
- Page 204 and 205:
The ecosystem is self-sustaining. I
- Page 206 and 207:
Assessemnt CriteriaProject Identifi
- Page 208 and 209:
V. GUIDE OF MANAGEMENT MEASURESIn t
- Page 210 and 211:
g) identification of tendency of st
- Page 212 and 213:
VI RELATION BETWEEN THE DANUBE PARK
- Page 214 and 215:
VI.2 The concept of Integrated Regi
- Page 216 and 217:
principles of nature conservation,
- Page 218 and 219:
EECONET emphasizes the importance o
- Page 220 and 221:
Criteria for selection of core area
- Page 222 and 223:
D. Selection of the natural areas s
- Page 224:
10. Thom, R.M., Diefenderfer H.L.