14.09.2015 Views

Operations Manual

Download - BAUER-Pileco

Download - BAUER-Pileco

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2. Safety Information<br />

2.6 Assembly, conversion, disassembly,<br />

maintenance, repair<br />

The Diesel Pile Hammer shall be inspected prior<br />

to the first time that it is put into operation and then<br />

annually by an expert. Said expert inspection must<br />

be carried out by persons that have participated<br />

in an extensive training program in our facilities.<br />

Assembly, conversion, disassembly, maintenance<br />

and repair work shall be carried out only by<br />

qualified and authorized personnel.<br />

The Diesel Pile Hammer must be shut off prior<br />

to carrying out any work on it. Death or serious<br />

injury may result.<br />

Make sure another person cannot put the<br />

equipment into operation when work is being<br />

performed, as death may result.<br />

The following must be observed for repair and<br />

maintenance work:<br />

• At least two persons must be present.<br />

Both must be familiar with the operating<br />

instructions and must know how to address<br />

safety questions.<br />

• One person shall be located where he or she<br />

is in a position to observe those performing<br />

the work. The Lockout Tagout Program must<br />

be in place to prevent any accidental start<br />

ups.<br />

• One person must be located at the main<br />

operating station to monitor the safety of the<br />

other persons. Said person must have access<br />

to an EMERGENCY switch (or shutoff cable<br />

for the fuel supply) in all situations.<br />

• An uninterrupted communication must be<br />

possible between the involved persons.<br />

• The work area must be appropriately<br />

illuminated.<br />

Maintenance and repair work can be carried out<br />

by one person only, when the pile hammer is<br />

completely shut off and all means to put it into<br />

operation are blocked.<br />

111 Berry Road<br />

Houston, TX 77002<br />

Tel. (713) 691-3000<br />

Fax (713) 691-0089<br />

E-mail: info@bauerpileco.com<br />

www.bauerpileco.com<br />

<strong>Operations</strong> <strong>Manual</strong> December 2012<br />

11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!