14.09.2015 Views

Operations Manual

Download - BAUER-Pileco

Download - BAUER-Pileco

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

8. Shutting down and storage<br />

3. Install the piston locking screws, impact block<br />

clamp, protective cap and exhaust covers<br />

(See Chapter 4.1 “Transport safety”).<br />

4. Remove the ropes from the fuel control pump.<br />

5. Take the hammer out of the lead. Put the<br />

hammer aside in reverse procedure like<br />

described in chapter 6.5.<br />

7. Remove the wire rope slings from the lifting<br />

ears (3).<br />

8. Put the carrier equipment out of operation<br />

(See operating instructions for the carrier<br />

equipment).<br />

9. Secure the job site in accordance with local<br />

regulations for barricaded job sites.<br />

6. Set the hammer on stable ground, if necessary<br />

use 3” thick wood planks.<br />

111 Berry Road<br />

Houston, TX 77002<br />

Tel. (713) 691-3000<br />

Fax (713) 691-0089<br />

E-mail: info@bauerpileco.com<br />

www.bauerpileco.com<br />

<strong>Operations</strong> <strong>Manual</strong> December 2012<br />

53

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!