14.09.2015 Views

Operations Manual

Download - BAUER-Pileco

Download - BAUER-Pileco

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

6. Starting the Diesel Hammer<br />

6.5 Lifting of piles<br />

Follow the operating instructions of the carrier<br />

equipment.<br />

Use only approved wire rope in accordance<br />

with Chapter 4.2 “Transport cables”.<br />

Observe the following information to prevent<br />

an overturning of the unit and damage to the<br />

lead and material to be driven.<br />

PPE (Personal Protective Equipment) that is<br />

required to perform any and all work shall be<br />

provided by your employer to safely perform<br />

this task. You must wear a life vest when<br />

working over water surfaces.<br />

Never pull the material to be driven from the lead<br />

tip. This may cause an overturning of the carrier<br />

unit or may bend the lead end.<br />

Always turn the unit in the direction of the impact<br />

point of the material to be driven. The inclined<br />

pulling force may cause the unit to overturn.<br />

The material to be driven must always be lifted in<br />

such a manner that:<br />

• there is no permanent deformation,<br />

• no cracks form in the material to be driven,<br />

• the material to be driven hangs vertically<br />

after lifting it.<br />

Never lift piles attached to the hammer using<br />

only one line. Always use a separate pile line.<br />

111 Berry Road<br />

Houston, TX 77002<br />

Tel. (713) 691-3000<br />

Fax (713) 691-0089<br />

E-mail: info@bauerpileco.com<br />

www.bauerpileco.com<br />

<strong>Operations</strong> <strong>Manual</strong> December 2012<br />

35

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!