m return - mbm-Service GmbH
m return - mbm-Service GmbH
m return - mbm-Service GmbH
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
GB<br />
3.6. STEAM BOILER CONTROLS<br />
Note: the steam boiler is not installed on models 10 GN<br />
1/1 C2 and 6 GN 1/1 C2-C3<br />
scarico_alp.eps<br />
Manual boiler water drain: pressing button "A" this function<br />
allows you to empty the boiler<br />
In the case of all other models, the boiler is emptied using the lever<br />
located under the control panel.<br />
Important! Risk of scalding.<br />
Exercise due care when manually emptying the boiler.<br />
Important! To prevent the build-up of lime-scale inside the<br />
boiler:<br />
� Make sure the water supply corresponds with the required<br />
characteristics - see Installation.<br />
� Always empty the boiler at the end of each day.<br />
genvapor_alp.eps<br />
A<br />
Functional level C6<br />
Boiler status indicator led:<br />
- off: boiler ready;<br />
- on: boiler preheating. Wait until the led switches off.<br />
- flashing: boiler filling or empty. Check the water supply to the<br />
oven!<br />
calcare_alp.eps<br />
Lime-scale indicator led: this indicator led starts flashing when<br />
the boiler needs descaling. To do this, follow the instructions<br />
given in paragraph 7.<br />
Before using the oven make sure:<br />
- the external electrical safety switch is connected;<br />
- the gas shut-off valve is open;<br />
- the water shut-off valves are open;<br />
- the boiler drain lever is in the closed position (only on<br />
those models fitted with a drain lever).<br />
48