Annual Plan 2016-17 - Approved by Council 27 June 2016
Kingborough Council 2016-17 Annual Plan
Kingborough Council 2016-17 Annual Plan
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
8.1.1 Roads, Bridges and Jetties ($6.713M)<br />
Roads include local roads, car parks, footpaths, traffic devices, traffic signs, street lighting and traffic<br />
signals.<br />
Bridges and jetties include bridges, major road culverts, boat ramps, jetties and other marine<br />
structures such as pontoons.<br />
Projects are identified through various internal and external inspections and auditing processes, risk<br />
management analysis and prioritisation processes.<br />
<strong>Council</strong> has a rolling program of infrastructure upgrades for these facilities based on independent risk<br />
assessments. Other projects may be derived through community need or identification of<br />
infrastructure deficiencies.<br />
Major projects for <strong>2016</strong>/<strong>17</strong> include:<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
$620,000 rehabilitation of Kunama Drive from Binya to No. 49 Kunama;<br />
$286,000 Summerleas Road footpath between Greenhill and Kingston View Drive;<br />
$320,000 Rehabilitation of Old Station Road between Channel Highway and the seawall;<br />
$480,000 rehabilitate Beach Road, Margate between Bundalla and Esplanade;<br />
$1,100,000 reconstruction of Powell Road, Blackmans Bay;<br />
$400,000 Margate to Snug shared pathway;<br />
$750,000 Beach Road from Bundalla to Channel Highway; and<br />
$252,000 resheeting of Lighthouse Road, Bruny Island.<br />
8.1.2 Property ($0.991M)<br />
Property includes sporting facilities, playgrounds, halls, public toilets and recreational facilities.<br />
The works identified come from safety inspections, external audits and planned asset renewal and<br />
replacement programs. All works are renewal actions or replacement of existing assets to comply<br />
with current standards.<br />
Major projects include:<br />
<br />
<br />
<br />
<br />
<br />
$290,000 Kingborough sports centre stadium floor replacement;<br />
$195,000 Alonnah toilet block;<br />
$90,000 Adventure Bay foreshore path;<br />
$67,000 Kingborough fitness centre gym floor replacement; and<br />
$60,000 asbestos removal from halls;<br />
8.1.3 Stormwater ($1.892M)<br />
Stormwater includes piped stormwater systems, waterways, treatment systems and open drainage<br />
systems.<br />
Projects are identified through investigation programs, event reporting from operational staff and<br />
the community and planned asset renewal and replacement planning.<br />
Kingborough <strong>Council</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2016</strong>/<strong>17</strong> Page | 55<br />
<strong>Approved</strong> <strong>by</strong> <strong>Council</strong> on <strong>27</strong> <strong>June</strong> <strong>2016</strong>