Annual Plan 2016-17 - Approved by Council 27 June 2016
Kingborough Council 2016-17 Annual Plan
Kingborough Council 2016-17 Annual Plan
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
8) PLANT HIRE FEE 2015/16 FEE <strong>2016</strong>/<strong>17</strong><br />
<strong>Plan</strong>t Hire charges are charges at internal rates particular to each item, so as to cover the cost of operating<br />
and replacing the item of plant. Hire charges are exclusive of the cost of the operators labour charges.<br />
VARIANCE<br />
INCL GST<br />
(%)<br />
9) CARAVAN TAX FEE 2015/16 FEE <strong>2016</strong>/<strong>17</strong><br />
VARIANCE<br />
INCL GST<br />
(%)<br />
* 'Mainland' Kingborough (per week) <strong>17</strong>.00 18.00 3.00%<br />
* Bruny Island (per week) <strong>17</strong>.00 18.00 3.00%<br />
10) WASTE CHARGES (NOT KINGBOROUGH WASTE SERVICES) FEE 2015/16 FEE <strong>2016</strong>/<strong>17</strong><br />
VARIANCE<br />
INCL GST<br />
(%)<br />
Kerbside Collection Service<br />
* Upgrade/Downgrade Mobile Garbage/Recycling Bin(s) Administration Fee 29.00 30.00 3.00%<br />
Mobile Garbage Bin Replacement Fee<br />
(Payable for the second and any subsequent replacement bin in any three-year period)<br />
* - 80 Litre Bin 63.00 65.00 3.00%<br />
* - 120 Litre Bin 74.00 76.00 3.00%<br />
* - 240 Litre Bin 106.00 109.00 3.00%<br />
Mobile Recycling Bin Replacement Fee<br />
(Payable for the second and any subsequent replacement bin in any three-year<br />
period)<br />
* - 140 Litre Bin 77.00 79.00 3.00%<br />
* - 240 Litre Bin 106.00 109.00 3.00%<br />
11) KINGBOROUGH WASTE SERVICES CHARGES FEE 2015/16 FEE <strong>2016</strong>/<strong>17</strong><br />
VARIANCE<br />
INCL GST<br />
(%)<br />
* General Waste (per tonne) 74.70 100.00 34.00%<br />
* Minimum Fee - Waste to the Walking Floor 10.00 10.00 0.00%<br />
* Household Collection Waste (per tonne) 102.00 110.00 0.00%<br />
Tyres (each)<br />
* Car Tyres 6.50 6.50 0.00%<br />
* Car tyres on rim 10.00 10.00 0.00%<br />
* Light Truck Tyres 12.00 12.00 0.00%<br />
* Light Truck Tyres on rim 16.50 16.50 0.00%<br />
* Truck Tyres 22.00 25.00 13.50%<br />
* Gas Bottles (each) 10.00 10.00 0.00%<br />
* Green Waste (per metre) 10.00 10.00 0.00%<br />
*<br />
*<br />
*<br />
Recycling Fee (where the customer does not have general waste)<br />
Steel<br />
Car Body – full<br />
Car Body - half<br />
No Charge<br />
50.00<br />
55.00<br />
30.00<br />
No Charge<br />
50.00<br />
55.00<br />
30.00<br />
N/A<br />
0.00%<br />
0.00%<br />
0.00%<br />
12) BRUNY TRANSFER STATION FEES FEE 2015/16 FEE <strong>2016</strong>/<strong>17</strong><br />
VARIANCE<br />
INCL GST<br />
(%)<br />
Garbage Bags<br />
* Single Garbage Bags 5.00 5.00 0.00%<br />
* Two Garbage Bags 8.00 8.00 0.00%<br />
* Three Garbage Bags 11.00 11.00 0.00%<br />
Light Vehicles<br />
* Light vehicles without trailer - boot load (3 garbage bags -55 litre) 11.00 11.00 0.00%<br />
* Light vehicles with or without trailer 3m3 load (5m3 Limit) 32.00 32.00 0.00%<br />
* Light vehicles without trailer - boot load (3 garbage bags -55 litre) 8.00 8.00 0.00%<br />
Kingborough <strong>Council</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2016</strong>/<strong>17</strong> Page | 78<br />
<strong>Approved</strong> <strong>by</strong> <strong>Council</strong> on <strong>27</strong> <strong>June</strong> <strong>2016</strong>