Annual Plan 2016-17 - Approved by Council 27 June 2016
Kingborough Council 2016-17 Annual Plan
Kingborough Council 2016-17 Annual Plan
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
ROADS, BRIDGES, AND JETTIES 16/<strong>17</strong> <strong>17</strong>/18 18/19 19/20 20/21<br />
Old Station Road Rehabilitation<br />
between Channel Highway and seawall<br />
320,000<br />
Parish Lane reconstruction 180,000<br />
Wells Parade rehabilitation(Illawarra to<br />
Suncoast)<br />
50,000 700,000<br />
Blanche Avenue reconstruction 10,000 230,000<br />
Roslyn Avenue Pedestrian refuge 30,000<br />
Access ramps 20,000 20,000 20,000 20,000 20,000<br />
Beach Road Margate - between<br />
Bundalla and Esplanade 480,000<br />
Huon Road embankment failure vicinity<br />
25 Morphetts Road 10,000 340,000<br />
Huon Road embankment failure vicinity<br />
1233 10,000 150,000<br />
Diamond Drive subsoil drainage 40,000<br />
Replace Pontoon at Kingston Beach 39,500<br />
Turning circle Melinga Place, Taroona<br />
Concrete footpath Alamo Close 20,000<br />
Walkway to be piped Allens Rivulet<br />
Road 25,000<br />
23,000<br />
Balmoral Road carpark reconstruction<br />
and kerb installation 193,650<br />
Safety guard rail Killora Road 140,000<br />
Concrete footpath Carinya Street 25,000<br />
Bus bays Algona Road 42,500<br />
Powell Road reconstruction 1,100,000<br />
Talone Avenue reconstruction 1,000,000<br />
Blowhole Road reconstruction 1,000,000<br />
Geotechnical investigation for future<br />
works 60,000 60,000 60,000 60,000 60,000<br />
Margate to Snug shared path 400,000<br />
Kingston Beach -Beach Road works (vic<br />
of motel) 110,000<br />
Kingston Beach-foreshore works 340,000 450,000 450,000<br />
Bike lane improvements 10,000 10,000 10,000 10,000 10,000<br />
Works necessitated <strong>by</strong> development 50,000 50,000 50,000 50,000 50,000<br />
Guardrail replacement 50,000 50,000 50,000 50,000 50,000<br />
Adventure Bay Hall carpark sealing 90,000<br />
Beach Road (Bundalla to Channel<br />
Highway) 750,000<br />
Morris Avenue rehabilitation 315,000<br />
Silverwater Park access and carpark<br />
upgrade 85,000<br />
Pelverata Road-major rehabilitation 210,000 250,000 250,000 250,000 250,000<br />
Kingborough <strong>Council</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2016</strong>/<strong>17</strong> Page | 62<br />
<strong>Approved</strong> <strong>by</strong> <strong>Council</strong> on <strong>27</strong> <strong>June</strong> <strong>2016</strong>