EVALUATION
PA00MFK3
PA00MFK3
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
MKBA Province Municipality MPA<br />
Palawan<br />
Coron<br />
Siete Pecados<br />
Culion<br />
Bugor<br />
Busuanga<br />
Royukon-Sagrado<br />
Calamianes Island<br />
Group (CIG)<br />
Danajon Reef<br />
(DR)<br />
Southern Negros<br />
(SN)<br />
Verde Island Passage<br />
(VIP)<br />
Bohol<br />
Getafe<br />
Inabanga<br />
Tubigon<br />
Nasingan<br />
Cuaming<br />
Pangapasan<br />
Negros Oriental Siaton Tambobo<br />
Salag-Maloh<br />
Andulay Siit<br />
Batangas<br />
Calatagan<br />
Mabini<br />
Tingloy<br />
Bagong Silang<br />
San Teodoro-Twin Rocks<br />
Sto. Tomas-Pulang Buli<br />
The main limitations of this evaluation included: (i) non-availability of some key informants on<br />
agreed schedules, resulting in cancellation or reduction in time of actual interviews; (ii) only<br />
nine 9 of 12 planned FGDs with Bantay Dagat (Sea Warden) groups were conducted due to<br />
absence of these groups in three sample areas; and (iii) absence of supporting documents of<br />
some LGUs that claimed to have achieved EAFM Level 2 status during field verifications, leading<br />
to the conduct of independent assessment of LGUs’ progress towards EAFM using the project’s<br />
newly devised EAFM benchmark criteria.<br />
FINDINGS, CONCLUSIONS AND RECOMMENDATIONS<br />
Findings<br />
Overall, the project achievements are on track at midterm as summarized below according to<br />
the three main evaluation objectives.<br />
Objective 1: The fundamental assumptions regarding the extent and conditions to which<br />
ECOFISH Project interventions will achieve targeted key results related to the “10 percent<br />
increase in biomass” are empirically feasible and practically oriented. However, the assumptions<br />
related to the “10 percent increase in the number of people with new or better employment”<br />
are not definitive as a significant number of interventions is still underway at midterm.<br />
None of the 12 evaluation questions were answered by “NO”, indicating that all questions are<br />
on track to be answered by the end of implementation. Six (6) evaluation questions (EQ# 2, 3,<br />
7, 8, 9, 12) were answered by “YES”, which means that all the indicators have been satisfied or<br />
these questions are already evaluable at midpoint. The six other questions (EQ#1, 4, 5, 6, 10,<br />
11) were answered by “MAYBE”, which indicates that some indicators have not been satisfied<br />
yet at midterm. However, ECOFISH Project has started to implement activities to ensure that<br />
the answers to these latter questions will become “YES” by the end of implementation.<br />
Objective 2: ECOFISH Project implementation is progressing and achieving results as planned.<br />
The factors and conditions to achieve the six key results are in place and enhanced, resulting in<br />
the project achieving most of its targets at midterm.<br />
<br />
Key Result A posted variable outcomes, as clarified in the Recommendations section:<br />
o Fish visual census inside MPA only: 7.3 percent (VIP), -0.9 percent (SN);<br />
3