3.2 SITE SELECTION CRITERIA<br />

Four MKBAs were pre-selected from among the eight ECOFISH Project sites based on the<br />

criteria (i.e., former FISH Project sites vs. new sites, resource rent condition, and extent of the<br />

project support on establishing social enterprises) stipulated in the SOW (Annex I):<br />

<br />

<br />

<br />

<br />

Danajon Reef (DR) in Bohol province,<br />

Verde Island Passage (VIP) in Batangas province,<br />

South Negros (SN) in Negros Oriental province, and<br />

Calamianes Group of Islands (CIG) in Palawan<br />

In addition, the presence of operational marine protected area (MPA) with biophysical baseline<br />

information generated by the project at the start of implementation in 2013 was considered as<br />

a key criterion in site selection.<br />

Based on these criteria, three municipalities with operational MPAs were selected per MKBA,<br />

except in South Negros MKBA where only the municipality of Siaton was included in the MPE<br />

due to the absence of extensive coral reefs in the region (Table 2). The geologic structure of<br />

the region with a very steep slope prevents the development of a coral reef area. Only the<br />

municipality of Siaton has a sloping bathymetry that allows reef development. Thus, the selected<br />

three barangays with operational MPAs were all situated in the municipality of Siaton.<br />

Table 2: Four MKBAs and the Municipalities and Barangays with MPAs Included in the MPE<br />

MKBA Municipality Barangays with MPAs<br />

Verde Island Passage (VIP) Calatagan 1. Bagong Silang<br />

Mabini<br />

2. San Teodoro-Twin Rocks<br />

Tingloy<br />

3. Sto. Tomas-Pulang Buli<br />

Danajon Reef (DR) Getafe 4. Nasingan<br />

Inabanga<br />

5. Cuaming<br />

Tubigon<br />

6. Pangapasan<br />

Calamianes Island Group (CIG) Coron 7. Siete Pecados<br />

Culion<br />

8. Bugor<br />

Busuanga<br />

9. Royukon-Sagrado<br />

South Negros (SN) Siaton 10. Tambobo<br />

11. Salag-Maloh<br />

12. Andulay Siit<br />

3.3 DATA COLLECTION METHODS<br />

A review of documents gathered during the inception phase guided the MPE team in choosing<br />

the most efficient and suitable methods of gathering information within the limited time allotted<br />

for the evaluation. Four methods were agreed with USAID/Philippines for the data collection:<br />

(1) key informant interview (KII), (2) focus group discussion (FGD), (3) secondary data review<br />

(SDR), and (4) documents verification on site (DVS). A desk review of secondary data was<br />

completed as an initial contractual deliverable (Annex II) which helped the team to identify<br />

data gaps for collection during the MPE to achieve the three evaluation objectives.<br />

14