<strong>Responsibility</strong> at Finavia A part of society Safety Staff wellbeing Environmental responsibility GRI<br />

Energy and water<br />

consumption and<br />

emissions<br />

Energy efficiency work at our airports is guided by Finavia’s<br />

Energy and Climate Programme. Our energy consumption<br />

per passenger is going in the right direction.<br />

Among other things, airports consume energy for heating, ventilation,<br />

cooling, lighting and maintenance equipment. In future, we<br />

will increase the use of automated methods to control the systems<br />

on the basis of demand. In <strong>2016</strong>, Finavia prepared a <strong>report</strong><br />

on the measures that are required if Helsinki Airport is to reach a<br />

carbon neutrality level of 3+, as defined by the ACA programme.<br />

• Finavia acts in accordance with the targets based on the<br />

BREEAM standard in different aspects of the planning and<br />

implementation of the Helsinki Airport development programme.<br />

Areas such as energy efficiency are guided by the targets.<br />

The new terminal buildings are the first sites that Finavia<br />

will apply the BREEAM environmental certification for buildings<br />

to. A solar power production unit will be installed on the roof of<br />

the terminal and the unit will become operational in summer<br />

2017.<br />

• In 2017, Helsinki Airport will apply for certification at level 3+<br />

(carbon neutral) under the ACA (Airport Carbon Accreditation)<br />

carbon dioxide emissions reduction programme of the Airports<br />

Council International. Finavia compensates for its emissions by<br />

acquiring emission reduction units compliant with international<br />

standards.<br />

Consumption of energy and water by<br />

Finavia airports<br />

Airport<br />

Electricity<br />

MWh<br />

Heating<br />

MWh<br />

Water<br />

m 3<br />

Enontekiö 446 253 302<br />

Halli 73 232 97<br />

Helsinki-Malmi 1,128 2,143 1,913<br />

Helsinki-Vantaa 54,067 22,711 115,145<br />

Ivalo 560 1,799 1,681<br />

Joensuu 706 1,203 1,030<br />

Jyväskylä 1,098 1,296 4,498<br />

Kajaani 525 896 1,038<br />

Kemi-Tornio 545 856 915<br />

Kittilä 1,392 1,818 3,965<br />

Kokkola-Pietarsaari 508 743 1,344<br />

Kuopio 1,639 2,084 4,099<br />

Kuusamo 566 832 758<br />

Maarianhamina 471 908 544<br />

Oulu 4,129 4,849 5,284<br />

Pori 512 1,184 1,329<br />

Rovaniemi 3,414 3,165 5,895<br />

Savonlinna 451 0* 225<br />

Tampere-Pirkkala 1,524 1,739 3,311<br />

Turku 2,319 1,041 3,879<br />

Utti 45 128 79<br />

Vaasa 1,390 2,157 2,299<br />

Total 77,507 52,037 159,630<br />

Consumption of heat, electricity, and water by<br />

Finavia properties in <strong>2016</strong><br />

Year <strong>2016</strong> Change, %<br />

Heating consumption 52 GWh 9.0<br />

Heating consumption per passenger 2.4 kWh/pax 5.5<br />

Electricity consumption 78 GWh 2.5<br />

Electricity consumption per<br />

3.7 kWh/pax -0.7<br />

passenger<br />

Water consumption 160,000 m 3 0.1<br />

Water consumption per passenger 7.6 l/pax -3.4<br />

Ground equipment energy<br />

26 GWh 8.3<br />

consumption<br />

Ground equipment energy<br />

consumption per passenger<br />

1.3 kWh/pax 8.3<br />

Passenger 20.8 million 3.5<br />

The calculations of values<br />

per passenger do not<br />

include Kauhava, Halli,<br />

Utti, and Malmi Airports,<br />

since there is no regular<br />

passenger traffic at these<br />

airports.<br />

* Electric heating<br />

<strong>Responsibility</strong> <strong>report</strong> <strong>2016</strong> 60