INSTALLATION &<br />

COMMISSIONING<br />

SECTION<br />

NUMBER INSTALLATION<br />

3<br />

3.1 MOUNTING THE ANALYSER<br />

3.2 HEATER INTERLOCK RELAYS<br />

3.3 EARTH, SHIELD & POWER CONNECTIONS<br />

3.4 CONNECTING THE <strong>PROBE</strong> CABLE<br />

3.5 CONNECTING THE FLUE THERMOCOUPLE (OPTIONAL)<br />

3.6 CONNECTING THE RELATIVE HUMIDITY SENSOR (OPTIONAL)<br />

3.7 CONNECTING THE AMBIENT TEMPERATURE SENSOR<br />

(OPTIONAL)<br />

3.8 CONNECTING THE <strong>OUTPUT</strong> CHANNELS<br />

3.9 CONNECTING THE ALARMS<br />

3.10 CONNECTING THE HORN RELAY<br />

3.11 CONNECTING THE AUTOMATIC PURGE & CALIBRATION SYSTEM<br />

3.12 CONNECTING REFERENCE AIR<br />

3.13 CONNECTING THE DUAL FUEL INPUT<br />

3.14 CONNECTING THE PRINTER<br />

3.15 INSTALLING THE <strong>OXYGEN</strong> <strong>PROBE</strong><br />

3.16 INSTALLING THE FLUE THERMOCOUPLE<br />

COMMISSIONING<br />

3.17 CONNECTING POWER –COLD START<br />

3.18 REFERENCE AIR FLOW SWITCH<br />

3.19 COMMISSIONING – MAINTENANCE MODE<br />

3.20 COMMISSIONING – SET-UP MODE<br />

3.21 RUN MODE<br />

3.22 HEATER BY-PASS SWITCH<br />

3.23 CHECKING THE ALARMS<br />

3.24 <strong>PROBE</strong> CALIBRATION<br />

3.25 FILTER PURGE SET-UP PROCEDURE<br />

3.26 CALIBRATION GAS SET-UP PROCEDURE<br />

3.27 DUST IN THE FLUE GAS<br />

3.28 STRATIFICATION