30.01.2023 Views

SUSTAINABLE BUS 2-2023

Topics? A clear picture of fundings available for zero emission buses in UK, an insight on the fuel cell bus market, a glimpse of the largest electric bus fleet in Middle East (hint: Mowasalat). Again: focus on safety precautions in H2 bus depots, a commentary on the market for second hand e-buses (and battery residual value). Finally: technical presentations of VDL Citea new generation (cover story!), Iveco Bus Crossway LE CNG, Rampini Hydron (and new zero emission bus range)

Topics? A clear picture of fundings available for zero emission buses in UK, an insight on the fuel cell bus market, a glimpse of the largest electric bus fleet in Middle East (hint: Mowasalat). Again: focus on safety precautions in H2 bus depots, a commentary on the market for second hand e-buses (and battery residual value).
Finally: technical presentations of VDL Citea new generation (cover story!), Iveco Bus Crossway LE CNG, Rampini Hydron (and new zero emission bus range)

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PORTFOLIO<br />

SUPPLEMENT<br />

YUTONG<br />

E12<br />

Length mm 12,170<br />

Passenger capacity n. 73<br />

Motor/kW Yutong YTM280-CV9-H/350<br />

Battery supplier<br />

CATL<br />

Battery capacity max kWh 422<br />

Charging technology plug-in<br />

StreetDeck Hydroliner FCEV<br />

Length mm 10,900<br />

Passenger capacity n. 86<br />

Motor / kW<br />

Voith VEDS<br />

Fuel cell module<br />

Ballard<br />

Fuel cell module power kW -<br />

Battery Forsee Power / NMC<br />

Battery capacity kWh 48<br />

Hydrogen capacity kg 27 (1,120 l)<br />

StreetDeck Electroliner BEV<br />

Length mm 10,900<br />

Passenger seats n. 95<br />

Motor / kW<br />

Voith VEDS<br />

Battery Forsee Power / NMC<br />

Battery capacity kWh 340 - 454<br />

Charging technology plug-in.<br />

Mobility, smart city<br />

Culture, technology and market of<br />

low and zero emission buses<br />

Established 1991<br />

Editor in chief<br />

Stefano Agnellini<br />

Managing editor<br />

Riccardo Schiavo<br />

Editorial staff<br />

Fabio Butturi, Ornella Cavalli,<br />

Alberto Gimmelli, Fabrizio Dalle Nogare,<br />

Stefano Eliseo, Fabio Franchini,<br />

Cristina Scuteri, Luca Vitali<br />

Layout & graphics<br />

Marco Zanusso (manager)<br />

Editorial management<br />

Fabio Zammaretti<br />

Printing<br />

Industrie Grafiche RGM srl,<br />

Rozzano (Mi)<br />

Milano City Court Authorization<br />

n. 860 – December 18th 1987 National<br />

Press Register n. 4596 – April 20th 1994<br />

Poste Italiane Inc. – Mail subscription<br />

D.L. 353/2003 (mod. in L. 27/02/2004 n°<br />

46) Art. 1, subsection 1, LO/MI<br />

VADO E TORNO<br />

EDIZIONI<br />

MANAGEMENT<br />

ADMINISTRATION<br />

via Brembo 27 - 20139 Milano.<br />

Tel. 02/55230950<br />

The Defining Event in Public Transport is Back!<br />

Get inspired!<br />

● Join the world’s biggest sustainable mobility event<br />

● Explore 6 congress tracks covering all public transport modes<br />

● Visit over 380 exhibitors showcasing the latest products, vehicles and innovations<br />

Website<br />

www.sustainable-bus.com<br />

ADVERTISING<br />

Management<br />

via Brembo 27<br />

20139 Milano<br />

tel. 02 55230950<br />

e-mail: pubblicita@vadoetornoedizioni.it<br />

CUSTOMER<br />

CENTRICITY<br />

INNOVATIVE & RESILIENT<br />

OPERATIONS<br />

NEXT GEN CITIES<br />

Head of Sales<br />

Luca Brusegani<br />

Yutong ICe12 (coach)<br />

Length mm 12,465<br />

Passenger capacity n. 49/59<br />

Motor/kW Yutong TZ368XSYTB38/350<br />

Battery type<br />

CATL<br />

Battery capacity max kWh 422<br />

Charging technology plug-in<br />

WRIGHT<strong>BUS</strong><br />

50<br />

GB Kite Hydroliner FCEV<br />

Length mm 12,000<br />

Passenger capacity n. 90<br />

Motor / kW<br />

Voith VEDS<br />

Fuel cell module Ballard FC Move<br />

Fuel cell module power kW 70 - 100<br />

Battery Forsee Power / NMC<br />

Battery capacity kWh 30 - 45<br />

Hydrogen capacity kg 35 - 50<br />

GB Kite Electroliner BEV<br />

Length mm 12,000<br />

Passenger seats n. 90<br />

Motor / kW<br />

Voith VEDS<br />

Battery Forsee Power / NMC<br />

Battery capacity kWh 340 - 454 - 567<br />

Charging technology plug-in.<br />

Sales agents<br />

Roberto Menchinelli (Roma)<br />

Maurizio Candia<br />

Angelo De Luca<br />

Emanuele Tramaglino<br />

Autobus Annual subscription<br />

Italy 37 euro, International 57 euro<br />

Air Mail Annual subscription<br />

65 euro<br />

Back issues<br />

7 euro<br />

Payments<br />

Current account 50292200<br />

Vado e Torno Edizioni srl,<br />

via Brembo 27, 20139 Milano.<br />

e-mail: abbonamenti@vadoetorno.com<br />

E-Mail<br />

info@sustainable-bus.com<br />

Copyright <strong>2023</strong> Vado e Torno Edizioni<br />

Notice to subscribers<br />

Vado e Torno Edizioni srl, within the framework of its<br />

commitment to transparency and in compliance with the<br />

new European Regulation on the protection of personal<br />

data, known as GDPR 2016/679, in force from 25<br />

May 2018, has updated the policy regarding personal<br />

data processing and has adapted the methods of data<br />

management in accordance with the new requirements.<br />

We invite you to take a look at the new policy, which<br />

you can consult (www.vadoetorno.com). It provides<br />

clearer and more specific information on the processing<br />

of your personal data and your rights in this regard.<br />

If you no longer wish to be contacted from Vado e<br />

Torno Edizioni srl click write an email to:<br />

privacy@vadoetorno.com.<br />

Copyright <strong>2023</strong> Vado e Torno Edizioni<br />

PUBLIC TRANSPORT FOR<br />

SOCIAL INCLUSION<br />

Local Partners<br />

TRANSITIONING<br />

TO NET ZERO<br />

TALENTED HAPPY<br />

STAFF<br />

REGISTER NOW AND JOIN US IN BARCELONA<br />

Register at<br />

www.uitpsummit.org

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!