10.01.2013 Views

Design Report Guided Missile Submarine SSG(X) - AOE - Virginia ...

Design Report Guided Missile Submarine SSG(X) - AOE - Virginia ...

Design Report Guided Missile Submarine SSG(X) - AOE - Virginia ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>SSG</strong>(X) <strong>Design</strong> – VT Team 3 Page 43<br />

3 Cost DV8 3 Battery Type<br />

4 Performance DV13 0.5<br />

4 Schedule DV13 0.5<br />

4 Cost DV13 0.5<br />

Manning<br />

reduction<br />

Manning<br />

reduction<br />

Manning<br />

reduction<br />

4 Performance DV14 1 Sonar<br />

4 Schedule DV14 1 Sonar<br />

4 Cost DV14 1 Sonar<br />

4 Performance DV14 4 Sonar<br />

4 Schedule DV14 4 Sonar<br />

4 Cost DV14 4 Sonar<br />

Zebra battery<br />

may be very<br />

expensive<br />

compared to<br />

alternatives<br />

Increased<br />

automation and<br />

reduced manning<br />

may not work<br />

Increased<br />

automation and<br />

reduced manning<br />

may cause<br />

delays<br />

Increased<br />

automation and<br />

reduced manning<br />

may have cost<br />

overruns<br />

LWWAA Does<br />

not meet<br />

performance<br />

TLRs<br />

LWWAA<br />

Schedule delays<br />

impact program<br />

LWWAA<br />

Development<br />

and acquisition<br />

cost overruns<br />

SUBTICS/<br />

Thales Suite<br />

does not meet<br />

performance<br />

TLRs<br />

SUBTICS/<br />

Thales Suite<br />

schedule delays<br />

impact program<br />

SUBTICS/<br />

Thales Suite<br />

development and<br />

acquisition cost<br />

overruns<br />

Table 27 - Event Probability Estimate<br />

Probability What is the Likelihood the Risk Event Will Occur?<br />

0.1 Remote<br />

0.3 Unlikely<br />

0.5 Likely<br />

0.7 Highly likely<br />

0.9 Near Certain<br />

12 0.5 0.5 0.25<br />

13 0.6 0.6 0.36<br />

14 0.5 0.3 0.15<br />

15 0.5 0.5 0.25<br />

16 0.3 0.5 0.15<br />

17 0.3 0.3 0.09<br />

18 0.3 0.3 0.09<br />

19 0.3 0.7 0.21<br />

20 0.3 0.5 0.15<br />

21 0.1 0.2 0.02<br />

Consequence<br />

Table 28 - Event Consequence Estimate<br />

Given the Risk is Realized, What Is the Magnitude of the Impact?<br />

Level Performance Schedule Cost<br />

0.1 Minimal or no impact Minimal or no impact Minimal or no impact<br />

0.3<br />

Acceptable with some<br />

reduction in margin<br />

Additional resources required;<br />

able to meet need dates<br />

10%

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!