SECTION 5. CANDIDATE RESTORATION, RETROFIT AND<br />
PRESERVATION SITES<br />
5.1 Upland BMP Retrofit Sites<br />
The intent of this section is two fold:<br />
1. Identify publicly owned parcels that are significant sources of pollution that would<br />
benefit from BMP retrofit.<br />
2. Identify catchments for detailed field investigation to identify privately owned parcels<br />
that are significant sources of pollution and appropriate for BMP retrofit.<br />
All retrofit BMPs installed in the <strong>Goose</strong> <strong>Creek</strong> <strong>Watershed</strong> should be designed with the<br />
Upland Pollutant Loading Rate Goals (Table 11) as a design standard.<br />
5.1.1 Priority Basins<br />
Based upon the upland pollutant load analysis, BMP retrofit efforts should be<br />
concentrated on or downstream of the most impacted basins. The 6 most impacted basins<br />
were focused upon for this plan. Figure 23 shows the extent of these focus basins within<br />
the <strong>Goose</strong> <strong>Creek</strong> <strong>Watershed</strong>. The following Section discusses each focus basin in detail.<br />
BASIN6<br />
BASIN8<br />
BASIN3<br />
BASIN10<br />
BASIN4<br />
BASIN13<br />
BASIN2<br />
BASIN1<br />
BASIN5<br />
BASIN11<br />
Figure 23: Focus Basins within the <strong>Goose</strong> <strong>Creek</strong> <strong>Watershed</strong>.<br />
41<br />
BASIN9<br />
BASIN12<br />
BASIN14<br />
BASIN7