15.01.2013 Views

Goose Creek Watershed Management Plan Version - Charlotte ...

Goose Creek Watershed Management Plan Version - Charlotte ...

Goose Creek Watershed Management Plan Version - Charlotte ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Goose</strong> <strong>Creek</strong> <strong>Watershed</strong> <strong>Management</strong> <strong>Plan</strong> <strong>Version</strong> 1...………………...October 31, 2009<br />

DSTOUS326<br />

Figure 35: Reach DSTOUS357 Area Map.<br />

Reach DSTOUS299<br />

DSTOUS358<br />

Reach DSTOUS299 is located in Basin 1 and flows through a relatively undeveloped<br />

stream corridor downstream of DSTOUS357 (see Figure 36). It may be beneficial to<br />

combine these two projects into a single effort. Livestock have access to the stream<br />

causing significant localized erosion and cows were noted in-stream at the time of<br />

assessment. Fencing of the livestock out of the creek should be a part of any restoration<br />

or enhancement effort. Notable bedrock and cobble are present. Pools are actively filling<br />

with sand and silt. Most of the entire stream reach is severely impacted by cattle. High<br />

BEHI with low NBS was noted. Good ripple pool sequence, very long riffles with<br />

cobbles and boulders.<br />

Recommendation: Restoration<br />

Estimated Cost: $397,271<br />

System: Major<br />

DSTOUS328<br />

55<br />

DSTOUS357

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!