2-8 <strong>Earthquake</strong> <strong>Protection</strong><br />

Page 34 <strong>FM</strong> <strong>Global</strong> Property Loss Prevention Data Sheets<br />

Fig. 17. Examples of bracing attachments to piping<br />

C. For multistory building risers where clearances meet the recommendations of Section 2.2.1.5.1, an<br />

additional flexible coupling is needed at each floor level. Locate the flexible coupling within 1 ft (0.3 m)<br />

of the floor (either above or below the floor; see Fig. 18). Where clearances per Section 2.2.1.5.1 are not<br />

provided, install flexible couplings within 1 ft (0.3 m) above and below the floor. (Exception: the flexible<br />

coupling below the floor should be located below any main supplying that floor.)<br />

D. Flexible couplings are not needed beneath floors that rest directly on the ground; however, a flexible<br />

coupling is needed above the ground floor as recommended in Sections 2.2.1.4.3(A) and 2.2.1.4.3(B).<br />

E. Provide a flexible coupling within 2 ft (0.6 m) above or below any intermediate points of lateral restraint<br />

<strong>for</strong> risers. Where welded piping systems exist from the riser through the crossmains, these flexible<br />

couplings may be omitted.<br />

2.2.1.4.4 Provide flexibility on feedmains and crossmains per the following recommendations.<br />

A. Provide a flexible coupling within 2 ft (0.6 m) above or below intermediate points of lateral restraint<br />

<strong>for</strong> vertical pipe. Where welded piping systems exist from the riser through the crossmains, these flexible<br />

couplings may be omitted.<br />

B. Provide flexible couplings within 2 ft (0.6 m) of the top and bottom of vertical pipe runs that are 6 ft<br />

(1.8 m) or greater in length (in conjunction with the sway bracing recommended in Section 2.2.1.1.3[A]).<br />

Where welded piping systems exist from the riser through the crossmains, these flexible couplings may<br />

be omitted.<br />

C. Provide a seismic separation assembly per Section 2.2.1.4.8 where any piping crosses a building<br />

seismic expansion joint or spans between buildings.<br />

D. Where clearances per Section 2.2.1.5.1 are not provided, install flexible couplings within 1 ft (0.3 m)<br />

of each side of a wall. Where welded piping systems exist from the riser through the crossmains, these<br />

flexible couplings may be omitted.<br />

©2010 Factory Mutual Insurance Company. All rights reserved.