22.01.2013 Views

DS 2-8 Earthquake Protection for Water-Based Fire ... - FM Global

DS 2-8 Earthquake Protection for Water-Based Fire ... - FM Global

DS 2-8 Earthquake Protection for Water-Based Fire ... - FM Global

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Earthquake</strong> <strong>Protection</strong> 2-8<br />

<strong>FM</strong> <strong>Global</strong> Property Loss Prevention Data Sheets Page 5<br />

Fig. 1. Flexible coupling and four-way sway bracing details <strong>for</strong> riser. NOTE: <strong>for</strong> risers located outside of<br />

buildings, Detail A or B may be used with the bracing attached to a structural element.<br />

C. Provide a two-way lateral sway brace within 2 ft (0.6 m) of the end of any horizontal manifold piping<br />

longer than 6 ft (1.8 m), or when there is one or more flexible coupling(s) on either the horizontal manifold<br />

piping or on the riser stub between the floor and the connection to the horizontal manifold piping. See<br />

Fig. 2.<br />

2.2.1.1.3 Brace vertical crossmain or feedmain piping, regardless of size, in accordance with the following<br />

guidelines.<br />

A. Provide four-way sway bracing at both the top and bottom of the vertical pipe run of 6 ft (1.8 m) or<br />

more. Locate each brace on the largest diameter pipe within 2 ft (0.6 m) of the respective piping turn.<br />

Provide intermediate four-way sway bracing similar to risers as recommended in Section 2.2.1.1.2(B).<br />

B. For vertical pipe runs of less than 6 ft (1.8 m) without bracing provided, flexible couplings should not<br />

be present within the vertical pipe run (including the piping turns). If flexible couplings are used or needed<br />

to satisfy flexibility recommendations (e.g., <strong>for</strong> pipe drops) at one or both turns <strong>for</strong> vertical pipe runs of<br />

less than 6 ft (1.8 m), then provide four-way bracing on the largest diameter pipe within 2 ft (0.6 m) of each<br />

turn equipped with flexible coupling(s).<br />

2.2.1.1.4 Brace horizontal crossmain or feedmain piping, regardless of size, in accordance with the following<br />

guidelines.<br />

A. Horizontal changes of direction: Provide crossmain or feedmain piping that has pipe runs of 6 ft (1.8<br />

m) or more adjacent to the change in direction with both lateral and longitudinal sway bracing within 2 ft<br />

(0.6 m) of the change of direction. If the diameter of the main reduces at the change of direction, locate<br />

©2010 Factory Mutual Insurance Company. All rights reserved.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!