3710.17F - CNATRA
3710.17F - CNATRA
3710.17F - CNATRA
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
2<br />
COMTRAWINGSIXINST <strong>3710.17F</strong><br />
22 Nov 11<br />
(IR) and Visual Routes (VR) which come under the cognizance of<br />
FACSFAC NPA.<br />
c. NAS Pensacola shall transmit or forward all flight<br />
plans, flight notifications, and VR and IR route entry/exit<br />
times as required.<br />
d. Each TRAWING SIX Squadron shall:<br />
(1) Fax one copy of the next day's flight schedule to<br />
NASP Base Operations as soon as possible but not later than 1800<br />
local time.<br />
(e).<br />
(2) Schedule IR/VR routes in accordance with reference<br />
(3) Maintain records of actual IR/VR usage for a period<br />
of one year from date flown. This data shall be forwarded to<br />
FACSFAC Pensacola (Code 302) and TW-6 (Code N33) by the fifth<br />
working day of each new quarter.<br />
(4) Ensure aircrews or duty officers give NASP Base<br />
Operations timely notification of pre-filed route cancellations<br />
or requests for "add on" pre-filed routes. Whenever possible,<br />
route requests, cancellations, or changes should be made as soon<br />
as known, but no less than 30 minutes prior to requesting<br />
clearance. "Add on" pre-filed routes with IR/VR legs require a<br />
minimum of two hours advance notification to FACSFAC prior to<br />
route entry for route deconfliction. "Add on" pre-filed routes<br />
delaying in Warning Area 155 (W-155) shall also be coordinated<br />
through FACSFAC.<br />
(5) Ensure aircrew comply with route structure and<br />
restrictions.<br />
(6) Provide flight following on all sorties utilizing<br />
pre-filed route flight plans which depart VFR for local training<br />
areas, outlying fields, or which contain VFR en-route delays.<br />
5. General<br />
a. Maximum use of all IR and VR routes is encouraged. It<br />
is prudent for each squadron to balance military training route<br />
usage to keep TRAWING SIX IR and VR routes in good standing.<br />
b. Changes to daily flight plans require additional<br />
handling which places an increase in workload on NAS Pensacola