<strong>Forest</strong> <strong>Road</strong> <strong>Engineering</strong> <strong>Guidebook</strong><br />
In addition to regular scheduled inspections, structures should be inspected<br />
after severe storm events.<br />
Inspection records<br />
The inspection record <strong>of</strong> a bridge or major culvert must include all <strong>of</strong> the<br />
following:<br />
• date <strong>of</strong> the inspection<br />
• a condition assessment <strong>of</strong> the components <strong>of</strong> the structure<br />
• a recommendation for any repairs that may be required and a schedule<br />
for those repairs<br />
• the date <strong>of</strong> the next scheduled inspection<br />
• the length <strong>of</strong> time a bridge has been at its current site<br />
• a note about whether a bridge was designed and constructed to be at the<br />
current site for no more than 15 years.<br />
Inspection records for major bridges and culverts must be retained for 1 year<br />
beyond the actual life <strong>of</strong> the structure at the site. Should a structure fail, these<br />
records will be useful in any subsequent investigation. These records can also<br />
be used as a reference to determine the type <strong>of</strong> structures that are costeffective<br />
and environmentally suitable for similar stream crossings.<br />
Structural deficiencies noted in inspections<br />
The sequence <strong>of</strong> identifying and correcting structural deficiencies in existing<br />
bridges is as follows:<br />
1. A qualified inspector identifies and records possible structural<br />
deficiencies.<br />
2. A pr<strong>of</strong>essional engineer carries out a field review <strong>of</strong> the structure, and<br />
confirms or recommends the following, as applicable:<br />
• the types <strong>of</strong> work that must be carried out to correct the deficiencies,<br />
or<br />
• the need to protect road users by either<br />
– installing signs detailing the load rating prepared by the engineer,<br />
or<br />
– closing or removing the structure.<br />
<strong>Road</strong> prism maintenance<br />
Maintenance is required to ensure user safety and stability <strong>of</strong> the road prism,<br />
and to minimize sediment transport from the road prism.<br />