Corporate - Macquarie
Corporate - Macquarie
Corporate - Macquarie
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
16<br />
INVESTMENTS<br />
INVESTING<br />
FOR THE FUTURE<br />
Whether to build new<br />
sections, interchanges and<br />
bypasses or improve existing<br />
networks, the APRR group<br />
continues to invest in and<br />
modernise its infrastructure.<br />
These investments aim to<br />
improve the satisfaction<br />
and safety of its customers.<br />
New<br />
constructions<br />
The new construction works carried out<br />
in 2009 concerned:<br />
n the A406 motorway and the south<br />
bypass around Mâcon, with the<br />
beginning of the main construction<br />
works and of the viaduct over the River<br />
Saône,<br />
n the Les Echets – La Boisse A432<br />
motorway where construction works<br />
on the La Côtière viaduct continue<br />
and where the earthworks have begun<br />
on the sections and on the motorway<br />
interchanges for the A42 and A46 Nord<br />
motorways,<br />
n the A714 motorway and the<br />
Montluçon motorway slip road, with<br />
the end of preparatory works and<br />
the beginning of widening works.<br />
These three new links, representing a<br />
total distance of 30 kilometres, will be<br />
opened to traffic between end-2010<br />
and mid-2011.<br />
€432 million<br />
invested in new constructions, network<br />
improvements and equipment renewal.<br />
2009 AnnuAL REPORT APRR<br />
Of which:<br />
Additional investments on<br />
motorways in service (ICAS)<br />
The Group maintains and improves<br />
the network by making regular<br />
complementary investments<br />
concerning:<br />
n widening to three lanes,<br />
n new interchanges,<br />
n enlargement and renovation of a large<br />
number of service and rest areas,<br />
n the creation of new interchanges and<br />
branches,<br />
n increased toll plaza capacities,<br />
n parking areas and buildings,<br />
n protection of the environment.<br />
n 1159 million for new constructions,<br />
n 1171 million for network improvements,<br />
n 184 million for operating assets (of which €29 million<br />
of road resurfacing material)<br />
n 118 million for associated costs, i.e. immobilised<br />
production plus interest during construction