Major network development works<br />

carried out during the year are as<br />

follows:<br />

n widening of the A31 over 98<br />

kilometres between Beaune and<br />

Langres, with the 2 x 3 lanes section<br />

opened to traffic in November 2009,<br />

n widening of the A36 between Belfort<br />

and Montbéliard over 19 kilometres,<br />

with the opening of the third lanes up to<br />

Montbéliard centre in December 2009,<br />

n the Mionnay half-interchange on<br />

the A46 to the north of Lyon with<br />

an opening to traffic in conjunction<br />

with that on the A432,<br />

n the Arlay interchange on the A39<br />

connected to the Jura services area,<br />

opened to traffic in September 2009,<br />

n the Chaux-Seynod interchange on<br />

the A41 Nord, where works began in<br />

September 2009, and which is due to<br />

open at end-2010.<br />

Amount of investments<br />

(in € millions) 2007 2008 2009<br />

New constructions 24.1 80.5 159.2<br />

Additional investments on motorways in service 342.5 303.1 171.2<br />

Road widening 163.7 182.1 112.3<br />

Road interchanges 8.9 4.0 8.0<br />

Tolls plazas 11.7 8.4 5.7<br />

Rest & service areas 22.4 12.4 4.9<br />

Operational systems 5.0 3.8 3.7<br />

Tunnels 91.2 52.0 6.1<br />

Engineering structures other than tunnels 2.0 2.4 5.0<br />

Buildings 4.7 6.2 5.4<br />

Roadways 14.2 8.1 8.6<br />

Environment (water and noise) 10.1 13.8 4.5<br />

Safety 6.5 6.5 6.0<br />

Other additional investments on motorways in service 2.3 3.4 1.0<br />

Cost associated (with production plus interest during production) 23.4 22.5 18.1<br />

Construction + Additional investments<br />

on motorways in service + Related costs 390.0 406.2 348.5<br />

Operating assets 62.2 59.2 55.1<br />

Road resurfacing 36.3 33.0 28.5<br />

TOTAL INVESTMENTS (excluding subsidies) 488.5 498.4 432.1<br />

Excluding costs associated with production<br />

+ interest during construction 465.0 475.9 414.0<br />

A432 LA CÔTIERE VIADUCT<br />

After two years of work, this<br />

exceptional 1,210 metre engineering<br />

structure carried by17 bearing<br />

points, including 2 abutments<br />

and 15 piers, is now beginning to<br />

blend into the La Côtière countryside.<br />

The pier construction works are now<br />

almost finished, and the steel frames<br />

to support the concrete decks are being<br />

pushed into position by successive<br />

phases from one pier to another.<br />

The viaduct also stands out for the<br />

innovative way in which it integrates<br />

into the environment. This is the<br />

result of a European design & build<br />

competition conducted in association<br />

with the State and the local<br />

authorities concerned.<br />

APRR 2009 AnnuAL REPORT<br />

17