02.07.2013 Views

teknik struktur bangunan jilid 3

teknik struktur bangunan jilid 3

teknik struktur bangunan jilid 3

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Jarak<br />

bentang,<br />

ft (m)<br />

Lebar B, in.<br />

(mm)<br />

1. lingkup pekerjaan dan peraturan <strong>bangunan</strong><br />

Dimensi penampang Properti penampang<br />

Tinggi D, in.<br />

(mm)<br />

D1, in. (mm) D2, in. (mm)<br />

A, in. 2<br />

(mm 2 10 6 )<br />

Gambar 9.17. Potongan FHWA precast prestressed voided;<br />

(a) tipikal potongan, dan (b) alternatif kunci geser<br />

Sumber: Chen & Duan, 2000<br />

Gambar 9.18. Potongan AASHTO balok I;<br />

(a) balok tipe II, III dan IV, dan (b) balok tipe V dan VI<br />

Sumber: Chen & Duan, 2000<br />

I x, in. 4<br />

(mm 4 10 9 )<br />

S x, in. 3<br />

(mm 3 10 6 )<br />

25 (7.6) 48 (1,219) 12 (305) 0 (0) 0 (0) 576 (0.372) 6,912 (2.877) 1,152 (18.878)<br />

30-35<br />

(9.1-10.7)<br />

40-45<br />

48 (1,219) 15 (381) 8 (203) 8 (203) 569 (0.362) 12,897 (5.368) 1,720 (28.185)<br />

(12.2-<br />

13.7)<br />

48 (1,219) 18 (457) 10 (254) 10 (254) 628 (0.405) 21,855 (9.097) 2,428 (39.788)<br />

50 (15.2) 48 (1,219) 21 (533) 12 (305) 10 (254) 703 (0.454) 34,517 (1.437) 3.287 (53.864)<br />

447

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!