completion of works to the Waste Water treatment Plant, craiova<br />
anul 1988, dar s-au sistat din cauza lipsei fondurilor. Au fost<br />
reluate în 1999, dar se impunea respectarea procedurilor europene,<br />
astfel prin sprijinul acordat <strong>de</strong> UE prin programul ISPA, lucrările au<br />
fost <strong>de</strong>marate în iulie, 2003, în baza unui contract <strong>de</strong> Proiectare şi<br />
Construcţie din cadrul măsurii ISPA încheiat cu contractorul<br />
Consorţiul TME Termomecanica Ecologia Sp.A Italia/Silec Sp.A..<br />
Contractul a fost ulterior reziliat în octombrie 2006 <strong>de</strong> către<br />
Autoritatea Contractantă, din cauza progresului slab înregistrat<br />
<strong>de</strong> contractorul Consorţiul TME Termomecanica Ecologia Sp.A<br />
Italia/Silec Sp.A. La momentul rezilierii contractului, valoarea contractului<br />
reziliat a fost <strong>de</strong> 7.060.508,24 €. In urma procesului<br />
castigat, s-a recuperat garantia <strong>de</strong> buna executie in valoare <strong>de</strong><br />
2.454.054,5 €.<br />
Ulterior, în urma procesului <strong>de</strong> licitaţie <strong>de</strong>rulat în perioada<br />
noiembrie 2006-aprilie 2007, a fost <strong>de</strong>semnat câştigător constructorul<br />
reprezentat <strong>de</strong> Consorţiul SISTEM YAPI din Turcia si EMIT din<br />
Italia. Contractul a fost semnat pe data <strong>de</strong> 26.10.2007.<br />
Bugetul alocat acestei lucrări se ridică la valoarea <strong>de</strong><br />
25.996.214,13€.<br />
Ca urmare a neîn<strong>de</strong>plinirii obligaţiilor ce-i reveneau, a<br />
lipsei unui suport financiar a<strong>de</strong>cvat din partea firmei SISTEM YAPI<br />
INSAAT VE TICARET Turcia în ve<strong>de</strong>rea accelerării lucrărilor din<br />
cadrul acestui contract, dar şi datorită <strong>de</strong>clarării falimentului firmei<br />
SISTEM YAPI INSAAT VE TICARET Turcia, în data <strong>de</strong> 3 iunie<br />
2010 <strong>de</strong> către Curtea Comercială din Kadikoy, Turcia, şi în conformitate<br />
cu Articolul 8.7 din Acordul <strong>de</strong> Consorţiu, celălalt partener<br />
al Consorţiului, firma EMIT - Ercole Marelli Impianti Tecnologici<br />
S.p.A., Italia, a <strong>de</strong>cis să preia toate obligaţiile şi responsabilităţile<br />
contractuale ale Consorţiului până la finalizarea Contractului.<br />
Subcontractori ai EMIT au fost: MITLIV, SFERA, CIROMAT,<br />
ELPREST, EUROMAGNUM,NOVAEDIL,TRANSFORMER,STEEL<br />
CONSTRUCT, HOLCIM, SHOBAS.<br />
2. PROVENIENTA<br />
FONDURILOR<br />
nr.5 / <strong>2011</strong> www.romaqua.ro<br />
Contractele <strong>de</strong> lucrări prevăzute în acest Proiect au fost<br />
finanţate prin Programul ISPA(Instrument Structural pentru Politici<br />
<strong>de</strong> pre-A<strong>de</strong>rare) cu 75% - contribuţia UE, diferenţa <strong>de</strong> 25% fiind<br />
constituită <strong>de</strong> co-finanţarea Consiliului Local Craiova prin împrumut<br />
<strong>de</strong> la BEI (Banca Europeană <strong>de</strong> Investiţii).<br />
Bugetul alocat acestui contract <strong>de</strong> lucrări prin Programul<br />
ISPA a fost <strong>de</strong> 25.996.214,13 €, din care, conform schemei <strong>de</strong> fioriginally<br />
began in 1988, but it eventually stopped due to the lack<br />
of funds. It restarted in 1999, but the European procedures were<br />
to be respected, thus, with the support of the EU, by means of the<br />
ISPA funds, the works started in July 2003 on the basis of a contract<br />
for Design and Construction of the ISPA measure with the consortium<br />
contractor TME Termomecanica Ecologia Sp.A Italia/Silec<br />
Sp.A. The contract was subsequently terminated in October 2006,<br />
by the Contracting Authority because of the poor progress ma<strong>de</strong><br />
by the contractor TME Termomecanica Ecologia Sp.A Italia/Silec<br />
Sp.A. At the moment of the contract termination, its value was<br />
7,060,508.24 € and as a result of a successful law suit, the Contracting<br />
Authority recovered performance bond worth 2454054.5<br />
€.<br />
Later, following the auction process during November<br />
2006 - April 2007, the consortium from SYSteM Yapi manufacturer<br />
in turkey and eMIt from Italy were <strong>de</strong>signated as winners.<br />
The contract was signed on October 26 th , 2007.<br />
The budget assigned to this project work amounts to<br />
25,996,214.13 €.<br />
However, as a result of the failure to perform obligations,<br />
the lack of a<strong>de</strong>quate financial support from the company System<br />
Yapi Insaat ve Ticaret from Turkey and slow e<strong>vol</strong>ution of the work<br />
un<strong>de</strong>r this contract, but also because of company bankruptcy of<br />
System Yapi Insaat ve Ticaret, Turkey, <strong>de</strong>clared on June 3 rd 2010<br />
by the Commercial Court in Kadikoy, Turkey, and according to<br />
Article 8.7 of the Consortium Agreement, the other partner of the<br />
consortium company EMIT - Ercole Marelli Impianti Processing<br />
SpA, Italy, <strong>de</strong>ci<strong>de</strong>d to take over all contractual obligations and responsibilities<br />
of the Consortium to complete the Contract.<br />
The EMIT subcontractors are: MITLIV, SFERA, CIRO-<br />
MAT, ELPREST, EUROMAGNUM, NOVAEDIL, TRANSFORMER,<br />
STEEL CONSTRUCT, HOLCIM, SHOBAS.<br />
2. FUNDS<br />
ALLOCATION<br />
The work contracts in this Project were financed by ISPA<br />
(Instrument for Structural Policies for Pre-Accession Treated)<br />
with 75% EU contribution, the difference of 25% being ma<strong>de</strong> up<br />
of the co-financing of The Local Council, Craiova through a loan<br />
from EIB Bank - European Investment Bank).<br />
The budget allocated to the contract works through the<br />
ISPA Program was of 25,996,214.13 € of which, according to the<br />
39