PROIECTE<br />

completion of works to the Waste Water treatment Plant, craiova<br />

anul 1988, dar s-au sistat din cauza lipsei fondurilor. Au fost<br />

reluate în 1999, dar se impunea respectarea procedurilor europene,<br />

astfel prin sprijinul acordat <strong>de</strong> UE prin programul ISPA, lucrările au<br />

fost <strong>de</strong>marate în iulie, 2003, în baza unui contract <strong>de</strong> Proiectare şi<br />

Construcţie din cadrul măsurii ISPA încheiat cu contractorul<br />

Consorţiul TME Termomecanica Ecologia Sp.A Italia/Silec Sp.A..<br />

Contractul a fost ulterior reziliat în octombrie 2006 <strong>de</strong> către<br />

Autoritatea Contractantă, din cauza progresului slab înregistrat<br />

<strong>de</strong> contractorul Consorţiul TME Termomecanica Ecologia Sp.A<br />

Italia/Silec Sp.A. La momentul rezilierii contractului, valoarea contractului<br />

reziliat a fost <strong>de</strong> 7.060.508,24 €. In urma procesului<br />

castigat, s-a recuperat garantia <strong>de</strong> buna executie in valoare <strong>de</strong><br />

2.454.054,5 €.<br />

Ulterior, în urma procesului <strong>de</strong> licitaţie <strong>de</strong>rulat în perioada<br />

noiembrie 2006-aprilie 2007, a fost <strong>de</strong>semnat câştigător constructorul<br />

reprezentat <strong>de</strong> Consorţiul SISTEM YAPI din Turcia si EMIT din<br />

Italia. Contractul a fost semnat pe data <strong>de</strong> 26.10.2007.<br />

Bugetul alocat acestei lucrări se ridică la valoarea <strong>de</strong><br />

25.996.214,13€.<br />

Ca urmare a neîn<strong>de</strong>plinirii obligaţiilor ce-i reveneau, a<br />

lipsei unui suport financiar a<strong>de</strong>cvat din partea firmei SISTEM YAPI<br />

INSAAT VE TICARET Turcia în ve<strong>de</strong>rea accelerării lucrărilor din<br />

cadrul acestui contract, dar şi datorită <strong>de</strong>clarării falimentului firmei<br />

SISTEM YAPI INSAAT VE TICARET Turcia, în data <strong>de</strong> 3 iunie<br />

2010 <strong>de</strong> către Curtea Comercială din Kadikoy, Turcia, şi în conformitate<br />

cu Articolul 8.7 din Acordul <strong>de</strong> Consorţiu, celălalt partener<br />

al Consorţiului, firma EMIT - Ercole Marelli Impianti Tecnologici<br />

S.p.A., Italia, a <strong>de</strong>cis să preia toate obligaţiile şi responsabilităţile<br />

contractuale ale Consorţiului până la finalizarea Contractului.<br />

Subcontractori ai EMIT au fost: MITLIV, SFERA, CIROMAT,<br />

ELPREST, EUROMAGNUM,NOVAEDIL,TRANSFORMER,STEEL<br />

CONSTRUCT, HOLCIM, SHOBAS.<br />

2. PROVENIENTA<br />

FONDURILOR<br />

nr.5 / <strong>2011</strong> www.romaqua.ro<br />

Contractele <strong>de</strong> lucrări prevăzute în acest Proiect au fost<br />

finanţate prin Programul ISPA(Instrument Structural pentru Politici<br />

<strong>de</strong> pre-A<strong>de</strong>rare) cu 75% - contribuţia UE, diferenţa <strong>de</strong> 25% fiind<br />

constituită <strong>de</strong> co-finanţarea Consiliului Local Craiova prin împrumut<br />

<strong>de</strong> la BEI (Banca Europeană <strong>de</strong> Investiţii).<br />

Bugetul alocat acestui contract <strong>de</strong> lucrări prin Programul<br />

ISPA a fost <strong>de</strong> 25.996.214,13 €, din care, conform schemei <strong>de</strong> fioriginally<br />

began in 1988, but it eventually stopped due to the lack<br />

of funds. It restarted in 1999, but the European procedures were<br />

to be respected, thus, with the support of the EU, by means of the<br />

ISPA funds, the works started in July 2003 on the basis of a contract<br />

for Design and Construction of the ISPA measure with the consortium<br />

contractor TME Termomecanica Ecologia Sp.A Italia/Silec<br />

Sp.A. The contract was subsequently terminated in October 2006,<br />

by the Contracting Authority because of the poor progress ma<strong>de</strong><br />

by the contractor TME Termomecanica Ecologia Sp.A Italia/Silec<br />

Sp.A. At the moment of the contract termination, its value was<br />

7,060,508.24 € and as a result of a successful law suit, the Contracting<br />

Authority recovered performance bond worth 2454054.5<br />

€.<br />

Later, following the auction process during November<br />

2006 - April 2007, the consortium from SYSteM Yapi manufacturer<br />

in turkey and eMIt from Italy were <strong>de</strong>signated as winners.<br />

The contract was signed on October 26 th , 2007.<br />

The budget assigned to this project work amounts to<br />

25,996,214.13 €.<br />

However, as a result of the failure to perform obligations,<br />

the lack of a<strong>de</strong>quate financial support from the company System<br />

Yapi Insaat ve Ticaret from Turkey and slow e<strong>vol</strong>ution of the work<br />

un<strong>de</strong>r this contract, but also because of company bankruptcy of<br />

System Yapi Insaat ve Ticaret, Turkey, <strong>de</strong>clared on June 3 rd 2010<br />

by the Commercial Court in Kadikoy, Turkey, and according to<br />

Article 8.7 of the Consortium Agreement, the other partner of the<br />

consortium company EMIT - Ercole Marelli Impianti Processing<br />

SpA, Italy, <strong>de</strong>ci<strong>de</strong>d to take over all contractual obligations and responsibilities<br />

of the Consortium to complete the Contract.<br />

The EMIT subcontractors are: MITLIV, SFERA, CIRO-<br />

MAT, ELPREST, EUROMAGNUM, NOVAEDIL, TRANSFORMER,<br />

STEEL CONSTRUCT, HOLCIM, SHOBAS.<br />

2. FUNDS<br />

ALLOCATION<br />

The work contracts in this Project were financed by ISPA<br />

(Instrument for Structural Policies for Pre-Accession Treated)<br />

with 75% EU contribution, the difference of 25% being ma<strong>de</strong> up<br />

of the co-financing of The Local Council, Craiova through a loan<br />

from EIB Bank - European Investment Bank).<br />

The budget allocated to the contract works through the<br />

ISPA Program was of 25,996,214.13 € of which, according to the<br />