04.03.2013 Views

Port-Wide Sewer System Management Plan(SSMP) - Port of Oakland

Port-Wide Sewer System Management Plan(SSMP) - Port of Oakland

Port-Wide Sewer System Management Plan(SSMP) - Port of Oakland

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

• SSO Data. The overall purpose and intent <strong>of</strong> the GWDRs is to reduce the amount<br />

and severity <strong>of</strong> SSOs. It is critical that the <strong>Port</strong> have available detailed information<br />

regarding SSOs that occur within the <strong>Port</strong> in order to establish whether or not the<br />

<strong>SSMP</strong> is effective in meeting the intent <strong>of</strong> the WDRs. The new statewide reporting<br />

requirements should help the <strong>Port</strong> to store this information, because the <strong>Port</strong>’s SSO<br />

reports are now maintained on a state run database available through the SWRCB<br />

website 1<br />

. Appendix O also provides a table that can be used by the <strong>Port</strong> to maintain<br />

relevant information pertaining to each SSO as it occurs.<br />

10.2.2 <strong>SSMP</strong> Implementation Monitoring<br />

To accurately gauge the progress <strong>of</strong> the <strong>SSMP</strong> and its successes or failures in preventing<br />

SSOs, the <strong>Port</strong> should establish a key staff member, or a group <strong>of</strong> staff members, to<br />

periodically monitor the implementation and effectiveness <strong>of</strong> the <strong>SSMP</strong> elements to<br />

determine which <strong>SSMP</strong> elements are being implemented or not implemented, and their<br />

general performance to date. This information will be useful in the preparation <strong>of</strong> <strong>SSMP</strong><br />

program audits (See Chapter 11) to establish overall trends. Notes or records <strong>of</strong> the<br />

monitoring activities should be kept on file, and can be placed in Appendix N as noted in<br />

Section 10.1.1.<br />

10.2.3 Preventative Maintenance Program Evaluation<br />

To accurately gauge the progress <strong>of</strong> the <strong>SSMP</strong> and its successes or failures <strong>of</strong> the <strong>Port</strong><br />

preventative maintenance program, the <strong>Port</strong> should establish a key staff member, or a<br />

group <strong>of</strong> staff members, to periodically review its performance. This information will be<br />

useful in the preparation <strong>of</strong> <strong>SSMP</strong> program audits (Chapter 11). Notes or records <strong>of</strong> the<br />

monitoring activities should be kept on file, and can be placed in Appendix N as noted in<br />

Section 10.1.1.<br />

10.2.4 <strong>SSMP</strong> Program Updates<br />

Updates to the <strong>Port</strong>’s <strong>SSMP</strong> programs will be performed based on the results <strong>of</strong> the two<br />

year program audits discussed in Chapter 11 <strong>of</strong> this report or whenever there are major<br />

changes to the <strong>SSMP</strong>. All program updates and modifications should be approved by the<br />

<strong>Port</strong>’s Legally Responsible Official (LRO), the Water <strong>System</strong>s Engineer, and incorporated<br />

into the <strong>SSMP</strong> report, when necessary. If there are major changes to the <strong>SSMP</strong>, it needs to<br />

be re-certified by the <strong>Port</strong>’s LRO on CIWQS. At a minimum, the <strong>Port</strong> shall update and recertify<br />

the <strong>SSMP</strong> once every five (5) years. The <strong>Port</strong> should budget for the costs associated<br />

with the <strong>SSMP</strong> updates.<br />

10.2.5 SSO Trends<br />

In order to optimize the performance <strong>of</strong> the <strong>Port</strong>’s sanitary sewer collection system, it is<br />

necessary to identify any SSO trends that may exist. Through the identification <strong>of</strong> such<br />

1 http://www.waterboards.ca.gov/water_issues/programs/ciwqs/<br />

May 2010 10-3<br />

pw://Carollo/Documents/Client/CA/<strong>Port</strong> <strong>of</strong> <strong>Oakland</strong>/8239A00/Deliverables/Ch10 (FinalA)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!