04.03.2013 Views

Port-Wide Sewer System Management Plan(SSMP) - Port of Oakland

Port-Wide Sewer System Management Plan(SSMP) - Port of Oakland

Port-Wide Sewer System Management Plan(SSMP) - Port of Oakland

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

were created for each unique pipeline. The <strong>Port</strong> can now integrate the unique pipe IDs from<br />

the collection system maps into the MP2 s<strong>of</strong>tware, giving the <strong>Port</strong> the ability to track<br />

maintenance activities in specific pipe reaches. Since the ability to track the effectiveness <strong>of</strong><br />

<strong>SSMP</strong> measures will be desirable when the <strong>Port</strong> performs <strong>SSMP</strong> program audits, it is<br />

recommended that the <strong>Port</strong> consider integrating the map IDs into the CMMS s<strong>of</strong>tware.<br />

5.4 PORT REHABILITATION AND REPLACEMENT PLAN<br />

As part <strong>of</strong> this project, CCTV inspections <strong>of</strong> selected <strong>Port</strong> sewers, as well as a wet weather<br />

flow-monitoring program were performed to identify areas with structural deficiencies (e.g,<br />

cracks in pipelines, etc.), areas with excessive amounts <strong>of</strong> infiltration and inflow (I/I), and<br />

other condition problems associated with gravity sewers (e.g, adverse slope conditions,<br />

“bellies,” etc.). Based on the results <strong>of</strong> work performed as part <strong>of</strong> this project, specific<br />

sewers have been targeted for rehabilitation or replacement: These pipelines are identified<br />

in Chapter 9, as well as the <strong>Port</strong>s <strong>System</strong> Evaluation and Capacity Assurance <strong>Plan</strong><br />

(SECAP), which is included in Appendix M.<br />

For budgetary purposes, the SECAP also assumes that additional sewers requiring<br />

rehabilitation or replacements not specifically identified in this project will be identified in the<br />

future. In addition, the SECAP includes costs associated with rehabilitation or replacement<br />

<strong>of</strong> <strong>Port</strong> Lift Stations to address condition issues as well as the requirements <strong>of</strong> the<br />

Environmental Protection Agencies (EPA’s) Administrative Order.<br />

5.5 STAFF TRAINING<br />

Upon hiring, the <strong>Port</strong> trains collection system’s staff on the proper operation and<br />

maintenance <strong>of</strong> the sewer system and on <strong>Port</strong> standard operating procedures (SOPs).<br />

Ongoing training for <strong>Port</strong> staff is provided through a combination <strong>of</strong> informal/on the job<br />

training and optional special training classes or seminars, such as those provided by the<br />

California Water Environment Association (CWEA).<br />

To aid in compliance with the GWDRs, it is recommended that the <strong>Port</strong> begin to <strong>of</strong>fer its<br />

maintenance workers with periodic “refresher courses” on <strong>Port</strong> SOPs and maintenance<br />

activities (e.g. hydr<strong>of</strong>lushing, etc.) for the collection system. In addition, it is recommended<br />

that these training sessions include training with regard to the new programs or policies that<br />

will be implemented as part <strong>of</strong> the <strong>SSMP</strong> and the new GWDRs. This is particularly<br />

important with respect to the reporting requirements for SSOs in the <strong>Port</strong>. It is essential that<br />

all staff is aware <strong>of</strong> the GWDRs and know who needs to be informed should an SSO occur.<br />

5.6 EQUIPMENT AND REPLACEMENT PART INVENTORIES<br />

The <strong>Port</strong> maintains an inventory <strong>of</strong> spare pump parts, pipes, and other parts needed to<br />

perform emergency repair work on the sewer system. Certain construction and other<br />

May 2010 5-24<br />

pw://Carollo/Documents/Client/CA/<strong>Port</strong> <strong>of</strong> <strong>Oakland</strong>/8239A00/Deliverables/Ch05 (FinalA)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!