Port-Wide Sewer System Management Plan(SSMP) - Port of Oakland

Port-Wide Sewer System Management Plan(SSMP) - Port of Oakland

Port-Wide Sewer System Management Plan(SSMP) - Port of Oakland

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

As part <strong>of</strong> the GWDRs, all agencies that own or operate sanitary systems greater than one<br />

mile in length that collect and/or convey untreated or partially treated wastewater to a<br />

publicly owned treatment facility are required to report Category 1 and Category 2 SSOs.<br />

The reporting <strong>of</strong> Private Lateral Sewage Discharges is optional.<br />

1.7 IMPLEMENTATION SCHEDULE<br />

The GWDRs have established an <strong>SSMP</strong> implementation schedule based on the size <strong>of</strong> the<br />

agency. As mentioned in Section 1.4, population estimates for the <strong>Port</strong> are difficult. It is<br />

estimated that the <strong>Port</strong> currently serves a population <strong>of</strong> roughly 8,700. The <strong>Port</strong>’s<br />

implementation schedule is therefore governed by the schedule established for agencies<br />

ranging in size from 2,500 to 10,000 persons. Table 1.2 contains the implementation<br />

schedule that must be followed by the <strong>Port</strong> in the development <strong>of</strong> this <strong>SSMP</strong>.<br />

Table 1.2 <strong>Sewer</strong> <strong>System</strong> Master <strong>Plan</strong> Implementation Schedule<br />

<strong>Port</strong>-<strong>Wide</strong> <strong>Sewer</strong> <strong>System</strong> <strong>Management</strong> <strong>Plan</strong><br />

<strong>Port</strong> <strong>of</strong> <strong>Oakland</strong><br />

Task Required Certification Date<br />

<strong>Plan</strong> and Schedule<br />

02/01/08<br />

Goals and Organization 05/01/08<br />

Overflow Emergency Response <strong>Plan</strong><br />

Legal Authority<br />

11/01/09<br />

O&M <strong>Plan</strong><br />

FOG <strong>Plan</strong><br />

Design and Performance Standards<br />

<strong>System</strong> Capacity Assurance <strong>Plan</strong><br />

05/01/10<br />

Final <strong>SSMP</strong> and Certification<br />

Note:<br />

1. Required Certification Date based on GWDR Order No. 2006-0003 for Population<br />

<strong>of</strong> 2,500 to 10,000.<br />

1.8 REPORT ORGANIZATION<br />

This <strong>SSMP</strong> contains twelve chapters. Appendices are provided to support the information<br />

provided in the text. A brief description <strong>of</strong> the chapters is provided as follows:<br />

Chapter 1 - Background. This chapter presents a summary <strong>of</strong> the <strong>Port</strong>’s sanitary sewer<br />

system service area, the need for the <strong>SSMP</strong>, a description <strong>of</strong> the regulatory history <strong>of</strong> the<br />

<strong>SSMP</strong>, and population estimates for the <strong>Port</strong>. General information, such as a list <strong>of</strong><br />

abbreviations and a list <strong>of</strong> references, is also provided to assist the reader.<br />

May 2010 1-8<br />

pw://Carollo/Documents/Client/CA/<strong>Port</strong> <strong>of</strong> <strong>Oakland</strong>/8239A00/Deliverables/Ch01 (FinalA)<br />

(1)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!