As part <strong>of</strong> the GWDRs, all agencies that own or operate sanitary systems greater than one<br />
mile in length that collect and/or convey untreated or partially treated wastewater to a<br />
publicly owned treatment facility are required to report Category 1 and Category 2 SSOs.<br />
The reporting <strong>of</strong> Private Lateral Sewage Discharges is optional.<br />
1.7 IMPLEMENTATION SCHEDULE<br />
The GWDRs have established an <strong>SSMP</strong> implementation schedule based on the size <strong>of</strong> the<br />
agency. As mentioned in Section 1.4, population estimates for the <strong>Port</strong> are difficult. It is<br />
estimated that the <strong>Port</strong> currently serves a population <strong>of</strong> roughly 8,700. The <strong>Port</strong>’s<br />
implementation schedule is therefore governed by the schedule established for agencies<br />
ranging in size from 2,500 to 10,000 persons. Table 1.2 contains the implementation<br />
schedule that must be followed by the <strong>Port</strong> in the development <strong>of</strong> this <strong>SSMP</strong>.<br />
Table 1.2 <strong>Sewer</strong> <strong>System</strong> Master <strong>Plan</strong> Implementation Schedule<br />
<strong>Port</strong>-<strong>Wide</strong> <strong>Sewer</strong> <strong>System</strong> <strong>Management</strong> <strong>Plan</strong><br />
<strong>Port</strong> <strong>of</strong> <strong>Oakland</strong><br />
Task Required Certification Date<br />
<strong>Plan</strong> and Schedule<br />
02/01/08<br />
Goals and Organization 05/01/08<br />
Overflow Emergency Response <strong>Plan</strong><br />
Legal Authority<br />
11/01/09<br />
O&M <strong>Plan</strong><br />
FOG <strong>Plan</strong><br />
Design and Performance Standards<br />
<strong>System</strong> Capacity Assurance <strong>Plan</strong><br />
05/01/10<br />
Final <strong>SSMP</strong> and Certification<br />
Note:<br />
1. Required Certification Date based on GWDR Order No. 2006-0003 for Population<br />
<strong>of</strong> 2,500 to 10,000.<br />
1.8 REPORT ORGANIZATION<br />
This <strong>SSMP</strong> contains twelve chapters. Appendices are provided to support the information<br />
provided in the text. A brief description <strong>of</strong> the chapters is provided as follows:<br />
Chapter 1 - Background. This chapter presents a summary <strong>of</strong> the <strong>Port</strong>’s sanitary sewer<br />
system service area, the need for the <strong>SSMP</strong>, a description <strong>of</strong> the regulatory history <strong>of</strong> the<br />
<strong>SSMP</strong>, and population estimates for the <strong>Port</strong>. General information, such as a list <strong>of</strong><br />
abbreviations and a list <strong>of</strong> references, is also provided to assist the reader.<br />
May 2010 1-8<br />