• Discussion with <strong>Port</strong> operating staff to identify any known FOG problem areas (or “hot<br />

spots”) within the <strong>Port</strong>;<br />

• Airport Terminal site visit;<br />

• Closed Circuit Television (CCTV) inspection <strong>of</strong> selected sanitary sewer lines within<br />

the <strong>Port</strong> collection system.<br />

This section summarizes the service area FOG evaluation.<br />

8.2.7.1<br />

Consultation <strong>of</strong> Operational Staff<br />

The initial step in conducting a FOG service area evaluation for the <strong>Port</strong> was to seek input<br />

from <strong>Port</strong> operations staff regarding any known FOG “hot spots” or other issues related to<br />

FOG. Examples <strong>of</strong> these issues are areas <strong>of</strong> historical FOG related overflows and sewer<br />

lines that frequently exhibit FOG buildup.<br />

Based on information provided by <strong>Port</strong> staff, the majority <strong>of</strong> sewers that exhibit blockages<br />

associated with FOG buildup are attributable to FSFs located within the <strong>Oakland</strong><br />

International Airport. In fact, <strong>of</strong> the three sanitary sewer “hot spots” identified by <strong>Port</strong> staff,<br />

two are attributable to FOG and are near or adjacent to the airport terminals (see<br />

Section 8.2.8).<br />

8.2.7.2<br />

A site visit was conducted at the <strong>Oakland</strong> International Airport terminals to identify which<br />

FSFs operate in the airport and to verify which FSFs are served, or are planned to be<br />

served, by grease interceptors. It was discovered during the site visit that the <strong>Port</strong> is<br />

becoming very proactive in requiring new FSFs in the airport to install large grease<br />

interceptors. A large grease interceptor for the new Chile’s Too was recently installed.<br />

Additionally, grease interceptors will be constructed to service two new food courts and the<br />

new Silver Dragon restaurant.<br />

8.2.7.3<br />

Airport Terminal Site Visit<br />

CCTV Inspection<br />

As part <strong>of</strong> the <strong>Port</strong>-<strong>Wide</strong> <strong>SSMP</strong> project, CCTV inspections were performed on selected<br />

sanitary sewer lines within the <strong>Port</strong> collection system. The primary purpose <strong>of</strong> these<br />

inspections was to identify pipeline or manholes with condition problems (e.g., cracked<br />

pipes, tree roots, adverse slope conditions) and to help identify areas with potential<br />

infiltration and inflow (I/I) issues. However, the inspections also helped to determine where<br />

FOG buildup is a problem in the sewers, which may be indicative <strong>of</strong> an issue with an FSF<br />

located upstream <strong>of</strong> the blockage. As the <strong>Port</strong> performs additional CCTV inspections,<br />

additional FOG problem areas may be identified.<br />

May 2010 8-8<br />

pw://Carollo/Documents/Client/CA/<strong>Port</strong> <strong>of</strong> <strong>Oakland</strong>/8239A00/Deliverables/Ch08 (FinalA)