• Discussion with <strong>Port</strong> operating staff to identify any known FOG problem areas (or “hot<br />
spots”) within the <strong>Port</strong>;<br />
• Airport Terminal site visit;<br />
• Closed Circuit Television (CCTV) inspection <strong>of</strong> selected sanitary sewer lines within<br />
the <strong>Port</strong> collection system.<br />
This section summarizes the service area FOG evaluation.<br />
8.2.7.1<br />
Consultation <strong>of</strong> Operational Staff<br />
The initial step in conducting a FOG service area evaluation for the <strong>Port</strong> was to seek input<br />
from <strong>Port</strong> operations staff regarding any known FOG “hot spots” or other issues related to<br />
FOG. Examples <strong>of</strong> these issues are areas <strong>of</strong> historical FOG related overflows and sewer<br />
lines that frequently exhibit FOG buildup.<br />
Based on information provided by <strong>Port</strong> staff, the majority <strong>of</strong> sewers that exhibit blockages<br />
associated with FOG buildup are attributable to FSFs located within the <strong>Oakland</strong><br />
International Airport. In fact, <strong>of</strong> the three sanitary sewer “hot spots” identified by <strong>Port</strong> staff,<br />
two are attributable to FOG and are near or adjacent to the airport terminals (see<br />
Section 8.2.8).<br />
8.2.7.2<br />
A site visit was conducted at the <strong>Oakland</strong> International Airport terminals to identify which<br />
FSFs operate in the airport and to verify which FSFs are served, or are planned to be<br />
served, by grease interceptors. It was discovered during the site visit that the <strong>Port</strong> is<br />
becoming very proactive in requiring new FSFs in the airport to install large grease<br />
interceptors. A large grease interceptor for the new Chile’s Too was recently installed.<br />
Additionally, grease interceptors will be constructed to service two new food courts and the<br />
new Silver Dragon restaurant.<br />
8.2.7.3<br />
Airport Terminal Site Visit<br />
CCTV Inspection<br />
As part <strong>of</strong> the <strong>Port</strong>-<strong>Wide</strong> <strong>SSMP</strong> project, CCTV inspections were performed on selected<br />
sanitary sewer lines within the <strong>Port</strong> collection system. The primary purpose <strong>of</strong> these<br />
inspections was to identify pipeline or manholes with condition problems (e.g., cracked<br />
pipes, tree roots, adverse slope conditions) and to help identify areas with potential<br />
infiltration and inflow (I/I) issues. However, the inspections also helped to determine where<br />
FOG buildup is a problem in the sewers, which may be indicative <strong>of</strong> an issue with an FSF<br />
located upstream <strong>of</strong> the blockage. As the <strong>Port</strong> performs additional CCTV inspections,<br />
additional FOG problem areas may be identified.<br />
May 2010 8-8<br />