04.03.2013 Views

Port-Wide Sewer System Management Plan(SSMP) - Port of Oakland

Port-Wide Sewer System Management Plan(SSMP) - Port of Oakland

Port-Wide Sewer System Management Plan(SSMP) - Port of Oakland

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

To comply with the GWDRs and the SWRCB requirements, it is recommended that the <strong>Port</strong><br />

adopt the “Greenbook” for the inspection and testing <strong>of</strong> new or rehabilitated sewers in the<br />

<strong>Port</strong>. This approach is consistent with City standards for the testing and inspection <strong>of</strong><br />

sanitary sewer facilities.<br />

6.3.2 City <strong>of</strong> <strong>Oakland</strong> Inspection Standards<br />

Standards for the inspection and testing <strong>of</strong> new or rehabilitated sewers in the City are<br />

provided in the “Greenbook”. City inspectors regulate all sewer construction work to ensure<br />

compliance with the City <strong>of</strong> <strong>Oakland</strong>'s municipal code, traffic safety, and the requirements<br />

specified in the “Greenbook”. All sewers are tested and inspected with closed circuit<br />

television (CCTV) technology prior to acceptance by the City.<br />

6.3.3 EBMUD Inspection Standards<br />

EBMUD’s “Standards and Guidelines for Design and Construction <strong>of</strong> Wastewater Facilities”<br />

contains procedures for the inspection and testing <strong>of</strong> new and rehabilitated sanitary sewer<br />

facilities. The standards are applicable to both new installations and rehabilitation <strong>of</strong><br />

existing facilities.<br />

May 2010 6-3<br />

pw://Carollo/Documents/Client/CA/<strong>Port</strong> <strong>of</strong> <strong>Oakland</strong>/8239A00/Deliverables/Ch06 (FinalA)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!