Port-Wide Sewer System Management Plan(SSMP) - Port of Oakland
Port-Wide Sewer System Management Plan(SSMP) - Port of Oakland
Port-Wide Sewer System Management Plan(SSMP) - Port of Oakland
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
To comply with the GWDRs and the SWRCB requirements, it is recommended that the <strong>Port</strong><br />
adopt the “Greenbook” for the inspection and testing <strong>of</strong> new or rehabilitated sewers in the<br />
<strong>Port</strong>. This approach is consistent with City standards for the testing and inspection <strong>of</strong><br />
sanitary sewer facilities.<br />
6.3.2 City <strong>of</strong> <strong>Oakland</strong> Inspection Standards<br />
Standards for the inspection and testing <strong>of</strong> new or rehabilitated sewers in the City are<br />
provided in the “Greenbook”. City inspectors regulate all sewer construction work to ensure<br />
compliance with the City <strong>of</strong> <strong>Oakland</strong>'s municipal code, traffic safety, and the requirements<br />
specified in the “Greenbook”. All sewers are tested and inspected with closed circuit<br />
television (CCTV) technology prior to acceptance by the City.<br />
6.3.3 EBMUD Inspection Standards<br />
EBMUD’s “Standards and Guidelines for Design and Construction <strong>of</strong> Wastewater Facilities”<br />
contains procedures for the inspection and testing <strong>of</strong> new and rehabilitated sanitary sewer<br />
facilities. The standards are applicable to both new installations and rehabilitation <strong>of</strong><br />
existing facilities.<br />
May 2010 6-3<br />
pw://Carollo/Documents/Client/CA/<strong>Port</strong> <strong>of</strong> <strong>Oakland</strong>/8239A00/Deliverables/Ch06 (FinalA)