Port-Wide Sewer System Management Plan(SSMP) - Port of Oakland
Port-Wide Sewer System Management Plan(SSMP) - Port of Oakland
Port-Wide Sewer System Management Plan(SSMP) - Port of Oakland
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Chapter 2<br />
GOALS<br />
This chapter summarizes goals established for the <strong>Port</strong> <strong>of</strong> <strong>Oakland</strong> (<strong>Port</strong>) <strong>Sewer</strong> <strong>System</strong><br />
<strong>Management</strong> <strong>Plan</strong> (<strong>SSMP</strong>).<br />
2.1 REGULATORY REQUIREMENTS<br />
2.1.1 San Francisco Bay Area RWQCB Requirements<br />
The San Francisco Bay Area Regional Water Quality Control Board (RWQCB) requires that<br />
each wastewater collection system agency develop, at a minimum, goals for the <strong>SSMP</strong> as<br />
follows:<br />
• To properly manage, operate, and maintain all parts <strong>of</strong> the wastewater collection<br />
system;<br />
• To provide adequate capacity to convey peak flows;<br />
• To minimize the frequency <strong>of</strong> Sanitary <strong>Sewer</strong> Overflows (SSOs);<br />
• To mitigate the impact <strong>of</strong> SSOs.<br />
2.1.2 SWRCB Requirements<br />
The State General Waste Discharge Requirements Order No. 2006-0003 (GWDRs) specify<br />
the following with respect to the goals element <strong>of</strong> the <strong>SSMP</strong>:<br />
“The purpose <strong>of</strong> this <strong>SSMP</strong> is to provide a plan and schedule to properly manage, operate,<br />
and maintain all parts <strong>of</strong> the sanitary sewer system. This will help reduce and prevent<br />
SSOs, as well as mitigate any SSOs that do occur.”<br />
2.2 <strong>SSMP</strong> OBJECTIVE<br />
The main <strong>Port</strong> objective for the <strong>SSMP</strong> is to effectively manage, operate, and maintain its<br />
sanitary sewer system to provide the world-class infrastructure facilities and services to its<br />
airport, seaport, and commercial real estate tenants and customers. This objective<br />
conforms to <strong>Port</strong>-<strong>Wide</strong> Strategic Goal Numbers 1, 2, and 3, which are listed below as a<br />
reference:<br />
1. Consider our customers and stakeholders first in all that we do by providing services,<br />
infrastructure, and support that help them fulfill their goals;<br />
2. Develop and maintain relationships <strong>of</strong> trust and integrity with our community,<br />
customers, public agencies, and other stakeholders to maximize the benefits to the<br />
region; and<br />
3. Improve the environmental conditions and stewardship at the <strong>Port</strong>.<br />
May 2010 2-1<br />
pw://Carollo/Documents/Client/CA/<strong>Port</strong> <strong>of</strong> <strong>Oakland</strong>/8239A00/Deliverables/Ch02 (FinalA)