Chapter 11<br />
<strong>SSMP</strong> PROGRAM AUDITS<br />
This chapter presents a summary <strong>of</strong> the procedures to be used by the <strong>Port</strong> <strong>of</strong> <strong>Oakland</strong><br />
(<strong>Port</strong>) to perform internal audits.<br />
11.1 REGULATORY REQUIREMENTS<br />
11.1.1 San Francisco Bay Area RWQCB Requirements<br />
The San Francisco Bay Area Regional Water Quality Control Board (RWQCB) requires that<br />
each wastewater collection system agency shall conduct an annual audit <strong>of</strong> their <strong>SSMP</strong><br />
which includes any deficiencies and steps to correct them (if applicable), appropriate to the<br />
size <strong>of</strong> the system and the number <strong>of</strong> overflows, and submit a report <strong>of</strong> such audit.<br />
The RWQCB allows this element to be waived for collection systems that serve a<br />
population <strong>of</strong> 10,000 or less. However, the SWRCB requirements do not allow for such a<br />
waiver. Therefore, the <strong>Port</strong> must perform program audits.<br />
11.1.2 SWRCB Requirements<br />
The State General Waste Discharge Requirements Order No. 2006-0003 (GWDRs) specify<br />
the following in relation to audits <strong>of</strong> the <strong>SSMP</strong>:<br />
As part <strong>of</strong> the <strong>SSMP</strong>, the Enrollee shall conduct periodic internal audits, appropriate to the<br />
size <strong>of</strong> the system and the number <strong>of</strong> sanitary sewer overflows (SSOs). At a minimum,<br />
these audits must occur every two years and a report must be kept on file. This audit shall<br />
focus on the effectiveness <strong>of</strong> the <strong>SSMP</strong> and the Enrollee’s compliance with the <strong>SSMP</strong><br />
requirements identified in this subsection (D.13), including identification <strong>of</strong> any deficiencies<br />
in the <strong>SSMP</strong> and steps to correct them.<br />
11.2 PORT <strong>SSMP</strong> PROGRAM AUDITS WORK PLAN<br />
In accordance with the requirements <strong>of</strong> the GWDRs, the <strong>Port</strong> shall perform periodic<br />
performance audits on its <strong>SSMP</strong>. An <strong>SSMP</strong> Program Audits Work <strong>Plan</strong> has been developed<br />
to provide guidance to the <strong>Port</strong> and is included in this section.<br />
11.2.1 Responsible Party for Program Audit<br />
The <strong>Port</strong>’s legally responsible <strong>of</strong>ficial (LRO), the Water <strong>System</strong>s Engineer, will oversee the<br />
performance <strong>of</strong> the <strong>SSMP</strong> program audit. He may also designate certain key <strong>Port</strong> staff that<br />
are knowledgeable in the <strong>Port</strong>’s sanitary sewer collection facilities to assist in the audits.<br />
The final audit report shall be reviewed and approved by the <strong>Port</strong>’s Chief Audit Officer.<br />
May 2010 11-1<br />
pw://Carollo/Documents/Client/CA/<strong>Port</strong> <strong>of</strong> <strong>Oakland</strong>/8239A00/Deliverables/Ch11 (FinalA)