Port-Wide Sewer System Management Plan(SSMP) - Port of Oakland
Port-Wide Sewer System Management Plan(SSMP) - Port of Oakland
Port-Wide Sewer System Management Plan(SSMP) - Port of Oakland
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
The <strong>SSMP</strong> must be updated every five years, and must include any significant<br />
program changes. Re-certification by the governing board <strong>of</strong> the Enrollee is required<br />
(as specified above) when significant updates to the <strong>SSMP</strong> are made. To complete<br />
this re-certification process, the Enrollee shall enter the data in the online SSO<br />
Database and mail the form to the State Water Board, as described above.<br />
12.2 COMMUNICATION PLAN<br />
In accordance with the GWDRs, the <strong>Port</strong> Board <strong>of</strong> <strong>Port</strong> Commissioners held a public<br />
hearing to formally approve and adopt the final <strong>SSMP</strong>. A copy <strong>of</strong> the resolution to formally<br />
approve and adopt the <strong>SSMP</strong> is included in Appendix P.<br />
To provide the public with the chance to review the <strong>SSMP</strong>, an electronic copy is available<br />
upon request. Additionally, a copy <strong>of</strong> the report is available at the <strong>Port</strong>’s main <strong>of</strong>fice, located<br />
at 530 Water Street in <strong>Oakland</strong>, CA 94607, for review by the public prior to and following<br />
final approval.<br />
12.3 FINAL CERTIFICATION<br />
The <strong>Port</strong>’s Legally Responsible Official (LRO) is required to certify that all sections <strong>of</strong> this<br />
report comply with the applicable GWDRs and the RWQCB requirements. This was<br />
accomplished by completing the certification portion in the Online SSO Database<br />
Questionnaire and sending the appropriate signed form to the SWRCB. A copy <strong>of</strong> the<br />
SWRCB certification is included in Appendix Q <strong>of</strong> this report.<br />
The <strong>Port</strong> shall update and re-certify the <strong>SSMP</strong> when significant changes are made. At a<br />
minimum, the <strong>Port</strong> will update and re-certify this report every five years.<br />
May 2010 12-2<br />
pw://Carollo/Documents/Client/CA/<strong>Port</strong> <strong>of</strong> <strong>Oakland</strong>/8239A00/Deliverables/Ch12 (FinalA)