04.03.2013 Views

Port-Wide Sewer System Management Plan(SSMP) - Port of Oakland

Port-Wide Sewer System Management Plan(SSMP) - Port of Oakland

Port-Wide Sewer System Management Plan(SSMP) - Port of Oakland

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The <strong>SSMP</strong> must be updated every five years, and must include any significant<br />

program changes. Re-certification by the governing board <strong>of</strong> the Enrollee is required<br />

(as specified above) when significant updates to the <strong>SSMP</strong> are made. To complete<br />

this re-certification process, the Enrollee shall enter the data in the online SSO<br />

Database and mail the form to the State Water Board, as described above.<br />

12.2 COMMUNICATION PLAN<br />

In accordance with the GWDRs, the <strong>Port</strong> Board <strong>of</strong> <strong>Port</strong> Commissioners held a public<br />

hearing to formally approve and adopt the final <strong>SSMP</strong>. A copy <strong>of</strong> the resolution to formally<br />

approve and adopt the <strong>SSMP</strong> is included in Appendix P.<br />

To provide the public with the chance to review the <strong>SSMP</strong>, an electronic copy is available<br />

upon request. Additionally, a copy <strong>of</strong> the report is available at the <strong>Port</strong>’s main <strong>of</strong>fice, located<br />

at 530 Water Street in <strong>Oakland</strong>, CA 94607, for review by the public prior to and following<br />

final approval.<br />

12.3 FINAL CERTIFICATION<br />

The <strong>Port</strong>’s Legally Responsible Official (LRO) is required to certify that all sections <strong>of</strong> this<br />

report comply with the applicable GWDRs and the RWQCB requirements. This was<br />

accomplished by completing the certification portion in the Online SSO Database<br />

Questionnaire and sending the appropriate signed form to the SWRCB. A copy <strong>of</strong> the<br />

SWRCB certification is included in Appendix Q <strong>of</strong> this report.<br />

The <strong>Port</strong> shall update and re-certify the <strong>SSMP</strong> when significant changes are made. At a<br />

minimum, the <strong>Port</strong> will update and re-certify this report every five years.<br />

May 2010 12-2<br />

pw://Carollo/Documents/Client/CA/<strong>Port</strong> <strong>of</strong> <strong>Oakland</strong>/8239A00/Deliverables/Ch12 (FinalA)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!