Port-Wide Sewer System Management Plan(SSMP) - Port of Oakland
Port-Wide Sewer System Management Plan(SSMP) - Port of Oakland
Port-Wide Sewer System Management Plan(SSMP) - Port of Oakland
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Table 11.2 Example <strong>Sewer</strong> Maintenance Tracking Table<br />
<strong>Port</strong>-<strong>Wide</strong> <strong>Sewer</strong> <strong>System</strong> <strong>Management</strong> <strong>Plan</strong><br />
<strong>Port</strong> <strong>of</strong> <strong>Oakland</strong><br />
Statistic<br />
Total Number <strong>of</strong><br />
Blockages<br />
Aviation<br />
Maritime<br />
Commercial/Real<br />
Estate<br />
Number <strong>of</strong> Blockages<br />
by Cause<br />
Roots<br />
Grease Deposition<br />
(FOG)<br />
Infiltration and Inflow<br />
Lift Station Failure<br />
Capacity Deficiency<br />
Vandalism<br />
Debris<br />
Other<br />
Total Miles <strong>of</strong> <strong>Sewer</strong><br />
Pipe Cleaned (miles)<br />
Preventative<br />
Corrective<br />
Percentage<br />
Corrective (percent)<br />
11.2.3.2 Operations Audit<br />
Year<br />
2007 2008 2009 2010 2011 2012 2013 2014 2015<br />
The operations audit focuses primarily on the following aspects, and is initiated by the LRO:<br />
• Operations Interviews. The LRO should conduct interviews with both Aviation and<br />
Maritime operations staff to determine how effective the <strong>SSMP</strong> has been in helping<br />
the crews respond to and mitigate the effects <strong>of</strong> SSOs. Questions that could be<br />
helpful in conducting these interviews include:<br />
– Is the Overflow Emergency Response <strong>Plan</strong> (OERP) being fully implemented,<br />
and is it working as envisioned?<br />
May 2010 11-5<br />
pw://Carollo/Documents/Client/CA/<strong>Port</strong> <strong>of</strong> <strong>Oakland</strong>/8239A00/Deliverables/Ch11 (FinalA)