07.03.2013 Views

VTrak E-Class Product Manual - Promise Technology, Inc.

VTrak E-Class Product Manual - Promise Technology, Inc.

VTrak E-Class Product Manual - Promise Technology, Inc.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Shutting Down the Subsystem<br />

103<br />

Chapter 4: Management with WebPAM PROe<br />

You can only do part of this function in WebPAM PROe. Additional action is<br />

required, as described below. To shutdown the subsystem:<br />

1. Click the Subsystem icon in Tree View.<br />

2. Click the Administrative Tools icon.<br />

3. Click the Shutdown link in Management View.<br />

A Shutdown or Restart tab will appear.<br />

4. On the Shutdown or Restart tab, select Shutdown from the dropdown menu.<br />

5. Click the Submit button.<br />

6. In the confirmation box, type the word confirm in the field provided.<br />

7. Click the OK button.<br />

When the controller shuts down, your WebPAM PROe connection will be<br />

lost.<br />

8. Wait for no less than two minutes.<br />

9. <strong>Manual</strong>ly turn off the power supply switches the back of the subsystem.<br />

Monitoring the Shutdown<br />

To monitor a shutdown, you must use the Command Line Interface (CLI) though<br />

a serial connection to the <strong>VTrak</strong>.<br />

At the “administrator@CLI>” prompt, type shutdown -a shutdown.<br />

When the “Shutdown complete. It is now safe to power off the subsystem.”<br />

message appears, turn off the power supply switches.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!