Working with WPI proved critical to this plant in maintaining its competitiveness in the die<br />

casting market by increasing productivity while simultaneously reducing energy consumption.<br />

The facility’s participation in the Case Western’s efforts identified the cause for increased<br />

oxidization in the molten metal, which was a major source for increased porosity in some <strong>of</strong> their<br />

die castings. Identifying this issue and taking proper corrective measures has decreased the level<br />

<strong>of</strong> scrap this facility produces.<br />

Not only has the participation and incorporation <strong>of</strong> the <strong>Metal</strong> <strong>Casting</strong> R&D results improved<br />

Aluminum <strong>Casting</strong> Facility-1’s productivity and reduced its energy consumption, it has also been<br />

a source <strong>of</strong> needed knowledge. In fact, this facility has relied on the UAB Lost Foam Consortium<br />

and WPI to act much like its own R&D resource. The facility has donated equipment and<br />

provided financial support to cost share <strong>Metal</strong> <strong>Casting</strong> R&D. Aluminum <strong>Casting</strong> Facility-1 has<br />

benefited from this by being a recipient <strong>of</strong> unbiased research. The facility also views its<br />

participation as an incentive that will attract young engineers.<br />

Finally, Aluminum <strong>Casting</strong> Facility-1 is a best-practice facility because it proactively seeks ways<br />

to improve its energy efficiency. The plant has an energy management team that is responsible<br />

for identifying potential areas for improvement and designing projects to implement those<br />

improvements. This team also seeks the advice <strong>of</strong> outside experts that may be able to identify<br />

potential areas for improvement that the team may have overlooked. This was the case when the<br />

facility applied to have an ESA performed through the Save Energy Now initiative. In<br />

combination, these efforts have led to the success and growth experienced by Aluminum <strong>Casting</strong><br />

Facility-1.<br />