Table 6-2 HAZOP work sheet of the BOP handl<strong>in</strong>g procedure<br />
HAZOP of the BOP handl<strong>in</strong>g procedure<br />
ID Work Guide Possible causes Consequences Actions required Action<br />
step word<br />
by<br />
1 1 NO The test HUB is not The BOP can not be tested Make sure the HUB is present<br />
present or does not work<br />
and is function<strong>in</strong>g<br />
2 1 NOT The test<strong>in</strong>g is not done The BOP may have failures The BOP should be tested<br />
that are not recovered before the procedure takes<br />
place<br />
3 1 MORE The test<strong>in</strong>g procedure is The workover may be Only essential functions should<br />
<strong>to</strong> extensive or lasts <strong>to</strong> unnecessarily delayed be tested on the rig, others are<br />
long<br />
tested prior <strong>to</strong> go<strong>in</strong>g offshore<br />
4 2 NOT The AX-seal is not<br />
present<br />
The BOP will leak<br />
5 2 PART A part of the AX-seal is The BOP will leak<br />
OF ruptured or scratched<br />
6 3 NO No BOP is present on the Delayed operation Make sure that BOP placed on<br />
fork lift<br />
the forklift<br />
7 3 MORE The forklift places the BOP has <strong>to</strong> be moved aga<strong>in</strong><br />
BOP <strong>in</strong> the wrong<br />
pos<strong>it</strong>ion<br />
and the operation is delayed<br />
8 3 MORE The BOP falls off the The BOP may not function<br />
forklift or is bumped as <strong>in</strong>tended or be broken<br />
9 4 NO The riser pipe rack is not Operation will be delayed as Check the programm<strong>in</strong>g of the<br />
<strong>in</strong> the right pos<strong>it</strong>ion or the rack must be moved or pipe handl<strong>in</strong>g system prior <strong>to</strong><br />
the system is<br />
the pipe handl<strong>in</strong>g system be operation<br />
programmed wrong re-programmed<br />
Diploma thesis, <strong>NTNU</strong> 2002<br />