Is it necessary to install a downhole safety valve in a subsea ... - NTNU
Is it necessary to install a downhole safety valve in a subsea ... - NTNU
Is it necessary to install a downhole safety valve in a subsea ... - NTNU
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Is</strong> <strong>it</strong> <strong>necessary</strong> <strong>to</strong> <strong><strong>in</strong>stall</strong> a <strong>downhole</strong> <strong>safety</strong> <strong>valve</strong> <strong>in</strong> a <strong>subsea</strong> oil/gas well?<br />
30 11 LESS The pressure is low The BOP is leak<strong>in</strong>g Acceptable leakage must be<br />
def<strong>in</strong>ed prior <strong>to</strong> operation<br />
31 12 NOT The BOP is not work<strong>in</strong>g The operations may be<br />
properly<br />
harder <strong>to</strong> perform or not able<br />
<strong>to</strong> be performed<br />
32 12 LESS Fluid is flow<strong>in</strong>g from the<br />
connection<br />
The BOP is leak<strong>in</strong>g<br />
33 13 NOT The BOP is jammed The BOP does not<br />
disconnect<br />
34 14 NOT The riser eleva<strong>to</strong>r is The BOP can not be lifted Make sure <strong>to</strong> have redundant<br />
broken<br />
from the seabed<br />
lift<strong>in</strong>g systems<br />
35 14 MORE The riser/ BOP assembly The BOP can not be lifted Make sure the riser eleva<strong>to</strong>r<br />
is <strong>to</strong> heavy <strong>to</strong> lift from the seabed<br />
and lift<strong>in</strong>g gear is properly<br />
proportionate for the job<br />
36 15 NO The guidel<strong>in</strong>es are not The BOP may not be moved<br />
able <strong>to</strong> loosen<br />
away from the seabed<br />
equipment and has <strong>to</strong> be<br />
raised above the <strong>subsea</strong><br />
equipment<br />
37 16 MORE Riser is screwed on <strong>to</strong> The pipes may not be able <strong>to</strong> Make sure <strong>to</strong> have cutt<strong>in</strong>g gear<br />
tight<br />
demount<br />
present at the s<strong>it</strong>e<br />
38 16 OTHER The roughneck is This may lead <strong>to</strong> a delay <strong>in</strong> Make sure the programm<strong>in</strong>g of<br />
THAN screw<strong>in</strong>g the pipe the the operation<br />
the iron roughneck is right<br />
oppos<strong>it</strong>e direction.<br />
prior <strong>to</strong> operation<br />
39 16 NO The riser pipe rack is not Operation will be delayed as Make sure the programm<strong>in</strong>g of<br />
<strong>in</strong> the right pos<strong>it</strong>ion or the rack must be moved or is right prior <strong>to</strong> operation<br />
the pipe handl<strong>in</strong>g system the roughneck be re-<br />
is programmed wrong programmed<br />
Diploma thesis, <strong>NTNU</strong> 2002<br />
51