26.03.2013 Views

Is it necessary to install a downhole safety valve in a subsea ... - NTNU

Is it necessary to install a downhole safety valve in a subsea ... - NTNU

Is it necessary to install a downhole safety valve in a subsea ... - NTNU

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Is</strong> <strong>it</strong> <strong>necessary</strong> <strong>to</strong> <strong><strong>in</strong>stall</strong> a <strong>downhole</strong> <strong>safety</strong> <strong>valve</strong> <strong>in</strong> a <strong>subsea</strong> oil/gas well?<br />

30 11 LESS The pressure is low The BOP is leak<strong>in</strong>g Acceptable leakage must be<br />

def<strong>in</strong>ed prior <strong>to</strong> operation<br />

31 12 NOT The BOP is not work<strong>in</strong>g The operations may be<br />

properly<br />

harder <strong>to</strong> perform or not able<br />

<strong>to</strong> be performed<br />

32 12 LESS Fluid is flow<strong>in</strong>g from the<br />

connection<br />

The BOP is leak<strong>in</strong>g<br />

33 13 NOT The BOP is jammed The BOP does not<br />

disconnect<br />

34 14 NOT The riser eleva<strong>to</strong>r is The BOP can not be lifted Make sure <strong>to</strong> have redundant<br />

broken<br />

from the seabed<br />

lift<strong>in</strong>g systems<br />

35 14 MORE The riser/ BOP assembly The BOP can not be lifted Make sure the riser eleva<strong>to</strong>r<br />

is <strong>to</strong> heavy <strong>to</strong> lift from the seabed<br />

and lift<strong>in</strong>g gear is properly<br />

proportionate for the job<br />

36 15 NO The guidel<strong>in</strong>es are not The BOP may not be moved<br />

able <strong>to</strong> loosen<br />

away from the seabed<br />

equipment and has <strong>to</strong> be<br />

raised above the <strong>subsea</strong><br />

equipment<br />

37 16 MORE Riser is screwed on <strong>to</strong> The pipes may not be able <strong>to</strong> Make sure <strong>to</strong> have cutt<strong>in</strong>g gear<br />

tight<br />

demount<br />

present at the s<strong>it</strong>e<br />

38 16 OTHER The roughneck is This may lead <strong>to</strong> a delay <strong>in</strong> Make sure the programm<strong>in</strong>g of<br />

THAN screw<strong>in</strong>g the pipe the the operation<br />

the iron roughneck is right<br />

oppos<strong>it</strong>e direction.<br />

prior <strong>to</strong> operation<br />

39 16 NO The riser pipe rack is not Operation will be delayed as Make sure the programm<strong>in</strong>g of<br />

<strong>in</strong> the right pos<strong>it</strong>ion or the rack must be moved or is right prior <strong>to</strong> operation<br />

the pipe handl<strong>in</strong>g system the roughneck be re-<br />

is programmed wrong programmed<br />

Diploma thesis, <strong>NTNU</strong> 2002<br />

51

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!