Is it necessary to install a downhole safety valve in a subsea ... - NTNU
Is it necessary to install a downhole safety valve in a subsea ... - NTNU
Is it necessary to install a downhole safety valve in a subsea ... - NTNU
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Component: DHSV (TRSCSSV flapper type)<br />
Failure rate<br />
(10 -6 /hours)<br />
Reliabil<strong>it</strong>y data dossier<br />
Failure mode<br />
Data source/comment<br />
5.84 Total Data for TRSCSSV, Reliabil<strong>it</strong>y of<br />
well completion equipment - Phase<br />
II p.20. Operational time 996.79<br />
2.87 ITL=<br />
LCP: 27.5%<br />
FTC: 21.6%<br />
=49.1%<br />
0.34 EXL=CLW=5.9%<br />
years, failures 51.<br />
Failures regard<strong>in</strong>g leakage through<br />
the DHSV. Reliabil<strong>it</strong>y of well<br />
completion equipment - Phase II<br />
p.21.<br />
Failures regard<strong>in</strong>g leakage through<br />
the DHSV control l<strong>in</strong>e. Reliabil<strong>it</strong>y<br />
of well completion equipment -<br />
Phase II p.21.<br />
3.00 Total Reliabil<strong>it</strong>y of surface controlled<br />
Sub Safety Valves- Phase IV p.18.<br />
Operational time 1140.9 years,<br />
failures regard<strong>in</strong>g the SCSSV for<br />
all TRSCSSV, 30.<br />
2.06 Total Reliabil<strong>it</strong>y of surface controlled<br />
Sub Safety Valves- Phase III p.61.<br />
Operational time 941.6 years,<br />
1.68 LCP: 11.8%<br />
FTC: 52.9%<br />
=64.4%<br />
Recommended values for calculations:<br />
Failure rate (10 -6 /hrs):<br />
EXL: 0.3<br />
LCP, FTC: 2.8<br />
failures 17.<br />
Test<strong>in</strong>g and ma<strong>in</strong>tenance:<br />
The DHSV is tested every 6 months and repaired if failure is detected.<br />
Comments and leakage paths:<br />
Reliabil<strong>it</strong>y of surface controlled<br />
Sub Safety Valves- Phase III p.62.<br />
Operational time 941.6 years,<br />
failures 17.<br />
The leakage is trough the DHSV, lead<strong>in</strong>g the fluid up the production tub<strong>in</strong>g. External leakage is<br />
from the DHSV <strong>to</strong> the annulus.<br />
D-3