Component: DHSV (TRSCSSV flapper type)<br />

Failure rate<br />

(10 -6 /hours)<br />

Reliabil<strong>it</strong>y data dossier<br />

Failure mode<br />

Data source/comment<br />

5.84 Total Data for TRSCSSV, Reliabil<strong>it</strong>y of<br />

well completion equipment - Phase<br />

II p.20. Operational time 996.79<br />

2.87 ITL=<br />

LCP: 27.5%<br />

FTC: 21.6%<br />

=49.1%<br />

0.34 EXL=CLW=5.9%<br />

years, failures 51.<br />

Failures regard<strong>in</strong>g leakage through<br />

the DHSV. Reliabil<strong>it</strong>y of well<br />

completion equipment - Phase II<br />

p.21.<br />

Failures regard<strong>in</strong>g leakage through<br />

the DHSV control l<strong>in</strong>e. Reliabil<strong>it</strong>y<br />

of well completion equipment -<br />

Phase II p.21.<br />

3.00 Total Reliabil<strong>it</strong>y of surface controlled<br />

Sub Safety Valves- Phase IV p.18.<br />

Operational time 1140.9 years,<br />

failures regard<strong>in</strong>g the SCSSV for<br />

all TRSCSSV, 30.<br />

2.06 Total Reliabil<strong>it</strong>y of surface controlled<br />

Sub Safety Valves- Phase III p.61.<br />

Operational time 941.6 years,<br />

1.68 LCP: 11.8%<br />

FTC: 52.9%<br />

=64.4%<br />

Recommended values for calculations:<br />

Failure rate (10 -6 /hrs):<br />

EXL: 0.3<br />

LCP, FTC: 2.8<br />

failures 17.<br />

Test<strong>in</strong>g and ma<strong>in</strong>tenance:<br />

The DHSV is tested every 6 months and repaired if failure is detected.<br />

Comments and leakage paths:<br />

Reliabil<strong>it</strong>y of surface controlled<br />

Sub Safety Valves- Phase III p.62.<br />

Operational time 941.6 years,<br />

failures 17.<br />

The leakage is trough the DHSV, lead<strong>in</strong>g the fluid up the production tub<strong>in</strong>g. External leakage is<br />

from the DHSV <strong>to</strong> the annulus.<br />

D-3