02.04.2013 Views

Operational Interface Procedures for the South Pole TDRSS Relay ...

Operational Interface Procedures for the South Pole TDRSS Relay ...

Operational Interface Procedures for the South Pole TDRSS Relay ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1.4 Reference Documents<br />

a. <strong>South</strong> <strong>Pole</strong> <strong>TDRSS</strong> <strong>Relay</strong> (SPTR) Operations Concept, July, 1997 (Available on <strong>the</strong><br />

SPTR Web site.)<br />

b. <strong>South</strong> <strong>Pole</strong> TDRS <strong>Relay</strong> Proposal, May 2, 1997<br />

c. Network Control Center Standard Operating <strong>Procedures</strong>, Volumes I and II, 532-<br />

SOP-NCC.<br />

d. Operations <strong>Interface</strong> <strong>Procedures</strong> Between <strong>the</strong> Goddard Space Flight Center Network<br />

Control Center and <strong>the</strong> White Sands Complex, 532-OIP-NCC/WSC.<br />

e. Operations <strong>Interface</strong> <strong>Procedures</strong> Between and NCC and STDN Users, 532-OIP-<br />

NCC/STDN Users.<br />

f. National Science Foundation <strong>South</strong> <strong>Pole</strong> Modernization (SPSM) Electronics Systems<br />

Preliminary Design, Version 3.00, July 14, 1997<br />

A2302s1 1-5/(1-6 blank) 532-OIP-NCC/SPTR

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!