02.04.2013 Views

Operational Interface Procedures for the South Pole TDRSS Relay ...

Operational Interface Procedures for the South Pole TDRSS Relay ...

Operational Interface Procedures for the South Pole TDRSS Relay ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Section 5. Communications <strong>Procedures</strong><br />

5.1 Voice Callsigns<br />

5.1.1 Purpose<br />

This procedure defines <strong>the</strong> NCC and WSC operations position voice callsigns used on <strong>the</strong><br />

SCAMA circuits.<br />

5.1.2 Participants<br />

a. NCC.<br />

b. WSC.<br />

5.1.3 Procedure<br />

Position and voice callsign are listed as follows:<br />

a. NCC<br />

b. WSC<br />

Position Callsign<br />

1. Technical Manager TM<br />

2. Scheduling Operator NCC Scheduling<br />

3. Forecast Analyst NCC Forecast<br />

4. Per<strong>for</strong>mance Analyst PA<br />

Position Callsign<br />

1. STGT Operations Supervisor STGT OS<br />

2. STGT Site Specialist STGT Ops<br />

3. STGT GCE Technician STGT Tech<br />

4. WSGT Operations Supervisor White Sands OS<br />

5. WSGT Site Specialist White Sands Ops<br />

6. WSGT GCE Technician White Sands Tech<br />

a2302s5 5-1 532-OIP-NCC/SPTR

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!