Operational Interface Procedures for the South Pole TDRSS Relay ...
Operational Interface Procedures for the South Pole TDRSS Relay ...
Operational Interface Procedures for the South Pole TDRSS Relay ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
9.1 Problem Reports<br />
9.1.1 Purpose<br />
Section 9. Reporting <strong>Procedures</strong><br />
This procedure establishes <strong>the</strong> method by which SPTR elements disseminate in<strong>for</strong>mation<br />
concerning SPTR communications.<br />
9.1.2 Participants<br />
a. NCC.<br />
b. SPTR Elements.<br />
c. WSC.<br />
d. Malabar Ground Station.<br />
9.1.3 Procedure<br />
a. In <strong>the</strong> event an operational problem arises, that affects scheduled operations, <strong>the</strong> SPTR<br />
element, at which <strong>the</strong> anomaly arose, submits a SPTR Problem Report (PRT) to <strong>the</strong> SPTR<br />
e-mail collective. A SPTR problem report may also be initiated by any user of <strong>the</strong> SPTR.<br />
The report should contain at minimum <strong>the</strong> following in<strong>for</strong>mation items:<br />
1. Description of problem (include real time IP data connectivity and/or retrieval of file<br />
server data.<br />
2. Time frame of problem<br />
3. Impact to operations<br />
4. Description of any resolution taken (if known or if applicable)<br />
b. The NCC does not troubleshoot Internet IP problems but can coordinate and resolve<br />
problems within <strong>the</strong> NASA Science Internet (NSI) network.<br />
c. Problems concerning <strong>the</strong> TDRS will be coordinated and resolved by <strong>the</strong> NCC with WSC.<br />
WSC will report failures/problems according to paragraph 9.3. The NCC will contact<br />
NISN and/or SPTR Sustaining Engineering at GSFC as appropriate to assist in working<br />
SPTR problems.<br />
a2302s9 9-1 532-OIP-NCC/SPTR