02.04.2013 Views

Operational Interface Procedures for the South Pole TDRSS Relay ...

Operational Interface Procedures for the South Pole TDRSS Relay ...

Operational Interface Procedures for the South Pole TDRSS Relay ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

will use <strong>the</strong> FDF view periods from <strong>the</strong> web site to prepare <strong>the</strong> weekly (two week view period)<br />

SPTR schedule. If <strong>the</strong>re are changes to <strong>the</strong> view periods, FDF will e-mail a change alert to <strong>the</strong><br />

Forecast and Real-time Schedulers, noting <strong>the</strong> changes. Once prepared, <strong>the</strong> two-week SPTR<br />

Schedule is transmitted by <strong>the</strong> NCC Forecast Scheduler to SPTR users via <strong>the</strong> e-mail SPTR<br />

collective described in 5.3.3.1d each Monday. The Schedule shows <strong>the</strong> week’s schedule starting<br />

on <strong>the</strong> upcoming Monday and <strong>the</strong> following week’s schedule.<br />

NOTE<br />

If less than 15 minutes is available on any given day <strong>for</strong> SPTR<br />

services, SPTR will not be scheduled <strong>for</strong> that day.<br />

6.1.3.4 SPTR Schedule Updates<br />

If <strong>the</strong>re are any changes to a released SPTR Schedule, due to support conflict, or TDRS<br />

maneuvers, <strong>the</strong> NCC Real-time Scheduler will e-mail an entirely new two-week schedule with <strong>the</strong><br />

changed periods identified to <strong>the</strong> SPTR collective. Each update is consecutively numbered (e.g.,<br />

12/97-1). There will only be one SPTR schedule in effect (one e-mail) that will identify SPTR<br />

changes or cancellations as required.<br />

NOTE<br />

In <strong>the</strong> event of near-real-time conflicts causing loss of SPTR time,<br />

<strong>the</strong> NCC will transmit a notification via <strong>the</strong> SPTR collective.<br />

6.1.3.5 Routine SHO Transmission<br />

The NCC schedules <strong>the</strong> daily SPTR contacts <strong>for</strong> <strong>the</strong> TDRS-1 SSAF/SSAR/KSAR services by<br />

locally generating and transmitting <strong>the</strong> required SHO(s) to WSC, based on <strong>the</strong> latest SPTR<br />

schedule, as part of <strong>the</strong> daily bulk schedule transmission.<br />

6.1.3.6 SHO Execution<br />

The WSC supports scheduled SPTR transmission times based upon <strong>the</strong> services and event start<br />

and stop times as scheduled by <strong>the</strong> NCC.<br />

a2302s6 6-2 532-OIP-NCC/SPTR

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!