<strong>MANUAL</strong> 4 – BITUMINOUS PAVEMENT SEALS<br />

2.8.2 Overlap<br />

The ideal height h of the spray lance must be in such a position that it obtains an overlap of<br />

approximately half the width of one jet. It is better to have h slightly higher than lower.<br />

Try to keep h a constant height while spraying, to obtain a uniform overlap and therefore a<br />

uniform application.<br />

Figure 4.3: Spraying height and sequence of spraying<br />

Once the correct height h for spraying above the road surface has been determined, it can<br />

be maintained by tying a piece of wire of the correct length to the lance as illustrated in<br />

Figure 4.4.<br />

2.9 Application of binder<br />

2.9.1 Checks<br />

Figure 4.4: Maintaining correct height for spraying<br />

Before spraying of the binder commences, the following checks must be done:<br />

• Ensure that there is sufficient emulsion, aggregate, diesel fuel and paraffin on site to<br />

complete the work. To do this, the area to be surfaced and the rate of application of<br />

the binder and aggregate, must be established.<br />

IMPLEMENTING EMPLOYMENT INTENSIVE ROAD WORKS 19<br />