09.04.2013 Views

MANUAL 4 - Construction Industry Development Board

MANUAL 4 - Construction Industry Development Board

MANUAL 4 - Construction Industry Development Board

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>MANUAL</strong> 4 – BITUMINOUS PAVEMENT SEALS<br />

Photo 4.19<br />

• Add the cement to the aggregate in the drum very slowly (Photo 4.20), making sure no<br />

lumps or clods of cement are added (or make a cement slurry before adding to mix).<br />

Photo 4.20<br />

• The mix must be inspected to ensure the uniform distribution of the cement in the<br />

aggregate, before any emulsion is added.<br />

Notes<br />

1. The cement must be added to the neat aggregate and no attempt must be made to<br />

add the dry cement after the emulsion has been added.<br />

2. If, for any reason, extra cement needs to be added, it must be added as a slurry of<br />

water and cement mixture.<br />

IMPLEMENTING EMPLOYMENT INTENSIVE ROAD WORKS 43<br />

MODULE<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!