<strong>MANUAL</strong> 4 – BITUMINOUS PAVEMENT SEALS<br />

MODULe 5: <strong>Construction</strong> of a Cape seal<br />

1. Specification<br />

The specification will call for the construction of a Cape seal, consisting of either a 13,2 mm<br />

or 19 mm single seal with an application of a slurry seal, constructed in accordance with the<br />

relevant specifications referred to in the scope of work in the contract documents.<br />

2. Materials<br />

Materials required for the construction of the Cape seal are:<br />

• Surfacing aggregate of the specified size (obtained from a commercial source/<br />

quarry).<br />

• Bituminous binder in the form of a bitumen emulsion, either Anionic spray grade<br />

emulsion (60/40) or Cationic spray grade emulsion (65/35).<br />

• Slurry aggregate of the specified grading (obtained from a commercial source/<br />

quarry).<br />

• Slurry binder in the form of an Anionic stable grade emulsion (60/40) with Vinzyl resin<br />

as emulsifier.<br />

3. <strong>Construction</strong> plant and equipment<br />

The following specialised plant and equipment is recommended to promote the<br />

construction of the Cape seal surfacing by labour intensive methods:<br />

• Shovels<br />

• Brooms<br />

• Builders’ wheelbarrows (Capacity ± 65 – 67 litres)<br />

• Hammer<br />

• 7 mm sisal rope, 2 3 50 m rolls<br />

• Reinforced paper, 4 rolls 3 1 metre wide<br />

• Steel pegs, 300 mm 3 9 mm<br />

• Chalk-line equipment<br />

• Steel tape, 50 m<br />

• Squeegees (Workshop drawing LIC 005)<br />

• 5 3 25 litre measuring containers with lifting handle (Workshop drawing LIC 009)<br />

• 5 3 10 litre measuring containers<br />

• Hessian drag<br />

• 105 litre drums open both ends with lifting handles (Workshop drawing LIC 010) for<br />

spotting aggregate (Photo 4.27)<br />

• 105 litre drums for checking spray rates and cleaning spray equipment<br />

• Drum lifter for lifting full drums of binder (Workshop drawing LIC 008)<br />

• Manually operated chip spreader (Photo 4.28) (Optional)<br />

IMPLEMENTING EMPLOYMENT INTENSIVE ROAD WORKS 52