27.06.2013 Views

A Feasibility Study - Aaltodoc - Aalto-yliopisto

A Feasibility Study - Aaltodoc - Aalto-yliopisto

A Feasibility Study - Aaltodoc - Aalto-yliopisto

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The maximum and minimum operating limits (in relation to the flow rate) for the<br />

chosen number of RO membranes are determined using the ROSA program. These<br />

limits represent the safe operating parameters. The system can operate outside of these<br />

limits, but with a decrease in the lifetime and performance of the RO membranes. The<br />

red box in Figure 37 depicts the Design Warnings, which marks the safe operating<br />

parameters.<br />

Figure 37. ROSA Report -screen. Red box marks the Design Warning, which indicates the limits<br />

for safe operating parameters.<br />

The maximum and minimum operational values are used with the WaveRoller<br />

performance curves in order to calculate the actual volume flow rate that the RO<br />

membranes are able to utilize. From this, the real amount of fresh water produced is<br />

calculated with ROSA. Also, the load factor of the <strong>Aalto</strong>RO system is calculated by<br />

dividing the volume flow rate suitable for the membranes with the annual volume flow<br />

rate, thus describing how much of the wave power is suitable for <strong>Aalto</strong>RO in each<br />

location.<br />

52

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!