All the calculations are for one WaveRoller unit with a width of 30 m.<br />

The product water must have a TDS value lower than 500 mg/l, as recommend<br />

by the United States Environmental Protection Agency (EPA 2012).<br />

The DOW FILMTEC SW30HRLE-370/34i by the Dow Chemical<br />

Company is chosen as the reverse osmosis membrane, due to its capabilities in<br />

performing well with challenging feed waters.<br />

The reverse osmosis pressure vessels will be for seven membrane elements each<br />

Each Site will be examined in a study area, comprising of a range on<br />

WaveRoller nominal pump capacities, starting from 0,03 m³/s and ending with<br />

0,24 m³/s.<br />

For each location the change in elevation from the WEC to the shore is 15<br />

m, the distance travelled to the shore is 500 m and each pipeline has one inlet<br />

and outlet and four 90º corners.<br />

The pressure loss from the travelled distance from the WEC to the shore will be<br />

kept under 3 bar, but since it is small compared to the initial pressure, it will be<br />

disregarded in the actual calculations in order to simplify the calculations.<br />

Financial calculations will be performed using the annuity method, with an<br />

estimated lifetime of 25 years and an interest rate of 8 %.<br />

The operational expenses are calculated with a fixed percentage share of the<br />

capital expenses: 5 % for the WEC and 15 % for the RO.<br />

In ROSA, the harshest option for the pre-treated water is chosen (Seawater with<br />

conventional pre-treatment, SDI < 5).<br />

The Energy Recovery Device (ERD) will be a hydraulic turbocharger with a<br />

computational average efficiency of 65 % (FEDCO 2012).<br />

From each site the permeate production (m³/day), the load factor (suitable wave<br />

power / available wave power), the cost of water (€/m³), the recovery rate, the<br />

permeate TDS (mg/l) and cost details will be given.<br />

54