All the calculations are for one WaveRoller unit with a width of 30 m.<br />
The product water must have a TDS value lower than 500 mg/l, as recommend<br />
by the United States Environmental Protection Agency (EPA 2012).<br />
The DOW FILMTEC SW30HRLE-370/34i by the Dow Chemical<br />
Company is chosen as the reverse osmosis membrane, due to its capabilities in<br />
performing well with challenging feed waters.<br />
The reverse osmosis pressure vessels will be for seven membrane elements each<br />
Each Site will be examined in a study area, comprising of a range on<br />
WaveRoller nominal pump capacities, starting from 0,03 m³/s and ending with<br />
0,24 m³/s.<br />
For each location the change in elevation from the WEC to the shore is 15<br />
m, the distance travelled to the shore is 500 m and each pipeline has one inlet<br />
and outlet and four 90º corners.<br />
The pressure loss from the travelled distance from the WEC to the shore will be<br />
kept under 3 bar, but since it is small compared to the initial pressure, it will be<br />
disregarded in the actual calculations in order to simplify the calculations.<br />
Financial calculations will be performed using the annuity method, with an<br />
estimated lifetime of 25 years and an interest rate of 8 %.<br />
The operational expenses are calculated with a fixed percentage share of the<br />
capital expenses: 5 % for the WEC and 15 % for the RO.<br />
In ROSA, the harshest option for the pre-treated water is chosen (Seawater with<br />
conventional pre-treatment, SDI < 5).<br />
The Energy Recovery Device (ERD) will be a hydraulic turbocharger with a<br />
computational average efficiency of 65 % (FEDCO 2012).<br />
From each site the permeate production (m³/day), the load factor (suitable wave<br />
power / available wave power), the cost of water (€/m³), the recovery rate, the<br />
permeate TDS (mg/l) and cost details will be given.<br />
54