impediments commencing out of imperfect pre-treatment are the sand grains (and other<br />

hard particles, i.e. parts of sea shells) and microbiological growth.<br />

The current research carried out by e.g. Matsumoto (2012) on the use of biofouling<br />

agents to reduce microbiological growth may be a functioning solution. It would reduce<br />

the loss of performance and lifetime of the membranes, but despite promising results, its<br />

effectiveness has not yet been broadly verified and its applicability to <strong>Aalto</strong>RO process<br />

remains uncertain<br />

The major threat caused by the minimum pre-treatment is the appearance of sand and<br />

other hard particles in the feed water. They pose a serious threat since they can cause<br />

abrasion on the piston pump of the WEC and the APG, resulting in mechanical wearing<br />

and at worst frequent replacement of devices. The particles are also harmful for the RO<br />

membranes and can cause ruptures and thus losses in performance.<br />

The effects of the minimum pre-treatment cannot be verified without a comprehensive<br />

practical research program and thus estimating the losses in performance, the costs of<br />

the frequent maintenance and replacement are difficult to estimate. They have been<br />

incorporated in the operational expenses in the calculations, but whether the estimation<br />

is correct, too large or small, is impossible to determine.<br />

10.1.4 Cost information<br />

The cost information used in determining the feasibility of the <strong>Aalto</strong>RO process has<br />

great uncertainties on almost every field. The WEC WaveRoller is still at a development<br />

phase and the cost when it is in serial production may differ significantly from the<br />

values used in this thesis. Also uncertain is how increasing the nominal pump capacity<br />

of the WaveRoller affects the price.<br />

The APG is at the beginning of its development and its costs and efficiency are likely to<br />

change considerably in the future. As with the WEC, it is uncertain how the price will<br />

change when the nominal volume flow rates change. The medium pressure piping can<br />

be constructed of various different materials, e.g. from numerous plastics and metals.<br />

Each supplier has different options and choosing the best one requires optimizing the<br />

price and durability of each option. The installation expenses of the medium pressure<br />

pipeline are also highly uncertain; it was extremely difficult to find comprehensive<br />

information about that topic.<br />

Estimating the maintenance costs of the RO system has been challenging. Due to the<br />

chosen minimal pre-treatment, the need of maintenance has been considered to be<br />

higher than in standard systems and the membrane replacement schedule more frequent.<br />

Without experimental knowledge derived from an actual prototype it is impossible to<br />

accurately evaluate the maintenance costs of the RO.<br />